My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48930
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48930
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:26:37 PM
Creation date
11/23/2007 4:42:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981032
IBM Index Class Name
General Documents
Doc Date
8/19/1985
Doc Name
BACKFILLING & GRADING NORTHERN 1 MINE
From
NORTHERN COAL CO
To
MLRD
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation Ido. 14 <br />1. THE PERMITTEE IS REQUIRED TO SUBD7I1^ TO ^1 HE DIVISION A <br />CERTIFIED REPORT FROM THE SUPERVISING REGISTERED PROFESSIONAL <br />ENGINEER, CERTIFYING THAT BACKFILLING AND GRADING AT THE PORTAL <br />AND ADIT AREAS HAS BEEN COMPLETED AS APPROVED IN THE PERMIT AND <br />THAT THE RESULTING SLOPES ARE STABLE. THIS REPORT SHOULD INCLUDE <br />A SUMh1ARY OF THE SUPERVISING ENGINEER'S OBSERVATIONS AND OPINIONS <br />ON THE BACKFILLED AREAS A1dD SHOULD BE SUBMITTED WITHIN 30 DAYS <br />OF COMPLETION OF BACKFILLING AND GRADING. <br />2. THE PERMITTEE SHALL SUBMI^1 A FINAL POST-MINING TOPOGRAPHIC <br />MAP (ON FIVE FOOT CONTOUR INTERVALS OR LESS) IJITHIN 30 DAYS <br />FOLLOWING FI14AL GRADING PREPARED BY A REGISTERED LAND SURVEYOR <br />WHICH CERTIFIES THAT THE APPROVED POST-I4INIidG APPROXIPAATE <br />ORIGINAL CONTOUR HAS BEEN ACHIEVED. <br />3. THE PERMITTEE IS REQUIRED TO SUBh1IT A PLAN FOR MONITORING <br />OF THE BACKFILLED PORTAL AREAS TO VERIFY THE BACKFILLED SLOPE <br />STABILITY. THIS PLAN MUST BE SUBMITTED TO AND APPROVED BY <br />THE DIVISION) PRIOR TO COMPLETION OF THE GRADING WORK SO THAT <br />THE PROGRAM CAN BE IMPLEMENTED UPON FINAL GRADING AT NOP,THERN <br />N0. 1 AND RIENAU N0. 2 PORTAL AREAS. THE PERMITTEE IS RE- <br />QUIRED TO SUBMIT ANNUAL REPORTS SUMMARIZING THE PRIOR YEAR'S <br />OBSERVATIOIS UNTIL SUCH TIME AS THE DIVISION RELIEVES THE <br />PERMITTEE OF THIS REQUIREMENT IN WRITING. A SPECIFIC DATE FOR <br />ANNUAL REPORT SUBMITTAL WILL BE IMPOSED AT SUCH TIME AS THE <br />h40NITORING PROGRAM IS APPROVED. <br />Northern's Response: <br />1. A Registered Professional Engineer has been contracted <br />to supervise the backfilling and grading and to prepare a <br />report. This should be submitted probably in November of <br />1985• <br />2. A Registered Land Surveyor will submit a final post- <br />mining topographic map again probably in November of 1985• <br />3. A plan for slope stability monitoring is hereby sub- <br />mitted for approval. <br />,1 <br />tip4C- <br />~ .\,J <br />f ~. <br />
The URL can be used to link to this page
Your browser does not support the video tag.