My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48898
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48898
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:26:27 PM
Creation date
11/23/2007 4:38:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
4/6/2000
Doc Name
AMENDMENT 1 TO PKA-0-457
From
DMG
To
ALL BIDDERS ON GEC MAINTENANCE PROJECT C-81-037
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;- <br /> III IIIIIIIIIIIII III <br /> <br /> <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparlmr~nt of N, lural Kesources <br />I31 3 Sherman SL, Room 21 5 <br />Dern~er, Colurarln d0?0} <br />Phone: 13031 A65JS67 <br />FAY: (3031 83'_ 8105 <br />DI`/ISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MIN ING•SAFETY <br /> BJI Ovens <br /> Cwcrnor <br />DATE: April 6, 2000 Greg E Watcher <br /> Executive D~reaor <br />TO: All Bidders on the GEC Maintenance Pro'ect C-81-037 <br />i ( ) Michael B. Long <br />Orvision Duenor <br />FROM: John Nelson, Division of Minerals and Geology <br />RE: Amendment No. 1 to PKA-0-457 <br />Thank you for your interest in the Pre-Bid Meeting. The following clarifications and amendments <br />should be noted and incorporated into the bid documents: <br />Item #1. Control of compaction: Compaction quality control will not be traditional moisture/density <br />testing and results. Quality control will be visual observation by the PROJECT MANAGER to <br />determine if the specific compaction effort is being expanded. <br />Item #2. Road removal: The existing road will not be removed, but will instead be left as a terrace <br />on the existing slope. The uphill road-cut ditch and the crest-of-embankment berm will be removed <br />and the roadbed out-sloped 2% prior to seeding. <br />Item #3. The thickness of the gravel wearing surface of the new road will be a minimum of 6 inches <br />thick. <br />Item #4. Width of roadway: The width of the gravel wearing surface of the road will be twelve (12) <br />feet for its entire length. Between stations 1+60 and 3+20 the width of the roadway will be 14 feet <br />to allow for installation of the guardrail. <br />Item #5. Item #4 on the bid schedule, Erosion Repair, is deleted as a bid item. This work will be <br />accomplished under Item # 5 Equipment Rental. <br />Item #6. One of the alternate borrow areas discussed during the Pre-Bid Meeting will be selected <br />for use after discussions with the landowner have taken place. <br />All terms and conditions of the Invitation and Bid other than as changed by this amendment remain <br />the same. <br />Receipt and acceptance of this amehdment shall be acknowledged on the bid form <br />
The URL can be used to link to this page
Your browser does not support the video tag.