My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48890
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48890
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:26:25 PM
Creation date
11/23/2007 4:38:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977284
IBM Index Class Name
General Documents
Doc Date
6/18/1999
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ROADABLE EQUIPMENT: <br />------------------ Total Eqp. Fleet Size Haul Trip Return Trip <br />Machine Description Cost/hr (no. hauled) Cost/hr Cost/hr <br />-----------------'--------------------'-------------------------------------------------------------- <br />------------------------------------------------------------------------------------------------------- <br />Flatbed Truck 30K GVW <br />542.05 <br /> <br />542.05 542.05 <br />Subtotals 542.05 E~:2.05 <br />MOB/DEMOB SUPPORT EQUIPMENT: --------- ----~•---- <br />sheet 2 of 2 <br />--------------------------- Weight Ownership Haul Rig Fleet Sixe Haul Trip Return Trip DOT Permit <br />Non-Roadable Eqp. Description (tons) Cost/hr Lost/hr (no. hauled) Cost/hr Cos:/hr Cost/ea <br />--'-_-------------------'-'---'--------__-----------'-----Subtotals :'-_____--50.00 ------'--7;0.00 -___---50.00 <br />Total Eqp. Fleet Size Haul Trip Return Trip <br />Roadable Eqp. Description Cost/hr (no. hauled) Cost/hr Cost/hr <br />Subtotals 50.00 40.00 <br />EDUI PMENT HAUL DISTANCE 8 TIME <br />______________________________ <br />Nearest major city or town within project area region: Naturita <br />Total one way travel distance = 12.0 miles. Average xravel speed = 25.00 mph. <br />Job Time - Non Roadable Equip.= 0.50 hours load Roadable Equip.= N/A hours load <br />0.48 hours haul 0.48 hours haul <br />0.50 hours unload N/A hours unload <br />0.48 hours return 0.48 hours return <br />JOB LOST Total Mob/Demob Cost = 51,416.46 <br />NOTE: Non-roadable equipment (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br />consisting of a one-uay loaded haul and a one-way empty return. Roadable equipment (no haul rig required) <br />costs based on one round trip. col orado DOT requires special permits for oversize equipment on certain <br />specified road segments within The State. Separate permits are required for each rig on ea:h loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equipment hauling, and loading/Unloading times must be increased substantially for equipment Nhich must be <br />partially dismantled for transport and re-assembled at the job site. Costs for lifting equipment and other <br />support equipment needed for this work should 6e included in the mob/demob costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.