Laserfiche WebLink
EFCI proposes to retain the access road once a letter from the <br />landowner, the Vento Trust can be obtained. <br />Configuration for the access road can be found on Figure 23, <br />Volume 1, Section 4.03 of the permit application. Detailed <br />design information for the access road ditch and culvert can <br />be found in Exhibit 19, "Drainage and Sediment Control Plan". <br />Maintenance of the road is achieved by grading and occasional <br />resurfacing with 3/4" gravel 4-6" thick to provide a smooth, <br />reliable operating surface. Surfacing materials do not <br />contain toxic or acid-forming components. <br />Light Use Roads: Rule 4.03.3 <br />Light use roads are to and from the south mine fan, the <br />substation, explosives bunker and north dewatering well. <br />All light use roads are shown on Map 17, "Mine Plan Map", Map <br />18, "Mine Surface Facilities" and Map 19, "Access and Light <br />Use Roads". No light use roads have been located near steep, <br />wet or unstable terrain, and no roads cross channels of <br />intermittent or ephemeral streams. Most of the roads on site <br />are existing ranch roads which are utilized by the mine on a <br />limited basis and for landowner access. Topsoil was not <br />salvaged for the most part. Reclamation of the roads if not <br />kept in place by landowner requests, will be the following: <br />roads will be ripped and scarified and slopes blended, natural <br />drainage will be re-established, areas disturbed will be re- <br />vegetated and topsoiled if and where possible. <br />II. Support Facilities <br />Information about the operation plan and surface facilities <br />can be found in Section 2.05.3 and 4.04 of the permit <br />application. No additional surface facilities are planned for <br />construction during this five year permit term. <br />Since the last permit term, several structures have been added <br />to the permit area. These are: <br />1. A mine fan to the south has been constructed with a road <br />permitted to access the fan. Minor Revisions 17 and 20, <br />approved in 2/5/92 and 8/7/92 respectively, dealt with <br />the installation of the Monarch Mine fan and as-builts, <br />while Technical Revisions No. 16, approved 10/25/93, <br />incorporated the fan road into the permit area. <br />2. Combination spillways at Ponds 2, 3 and 4 were approved <br />with the hydrologic calculations submitted under <br />Technical Revision No.il, approved 3/6/92. <br />26 <br />