My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48846
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48846
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:26:09 PM
Creation date
11/23/2007 4:36:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
General Documents
Doc Date
1/14/2004
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2004 Midterm Review <br />Rule 4.19 Protection of Underground Mining <br />In compliance by exception. There was no surface mining at the site. <br />Rule 4.20 Subsidence Control <br />In compliance. There is a subsidence control plan in the PAP, but there turned out to be no need <br />for subsidence control at the site due to premature closure of the mine. <br />Rule 4.21 Coal Exploration <br />In compliance. There was coal exploration activity at the site prior to issuance of the Permit. <br />Rule 4.22 Concurrent Surface and Underground Mining <br />In compliance by exception. There is no surface mining at the site. <br />Rule 4.23 Auger Mining <br />In compliance by exception. There is no auger mining at the site. <br />Rule 4.24 Operations in Alluvial Valley Floors <br />Incompliance. Surface activities took place on the alluvial valley floor of the Colorado River. <br />Disturbances were shallow, areas reclaimed, and irrigation systems have been restored. <br />Rule 4.25 Operations on Prime Farmland <br />Incompliance by exception. There is no azea of prime farmland on site (PAP page 3-94). <br />Rule 4.26 Mountaintop Removal <br />Incompliance by exception. There aze no mountaintop removal operations at the site. <br />Rule 4.27 Operations on Steep Slopes <br />In compliance by exception. There aze no steep slope operations at the site. <br />Rule 4.28 Coal Processing Plants et al <br />In compliance by exception. A coal loadout (Lacy Loadout) has been released from the Permit. <br />Rule 4:L9 )n Situ Processing <br />In compliance by exception. There is no in situ processing at the site. <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.