Laserfiche WebLink
~~ <br /> <br />process. A 2.8 to 1 horizontal to vertical slope gradient <br />will be maintained during the construction of the tailings <br />dam, which will be raised in successive stages to a maximum <br />height of 30 feet. When the tailings impoundment dam has <br />reached its storage capacity, it will occupy a rectangular <br />area that will have the dimensions 400 feet by 260 feet at its <br />longest and widest points. <br />~l 1 <br />~fw(~ ~ <br />IlL'X~LII Yk <br />S~Ura <br />p ~ LLa r <br />m ({tizrz~ A <br />/~ <br />This milling complex has been designed to maintain a stable <br />water balance throughout the ore processing and tailings <br />impoundment system. The milling operation will require 4 tons <br />of water for every ton of ore processed in the gravity and <br />flotation concentration circuits. Fresh water will be intro- <br />duced into the milling process in the grinding circuit (see <br />Figure 11. Most of the water that w. .1 be used in grinding and <br />classification, and in the gravity concentration circuit, will <br />be recycled from the thickener tank overflow launder back to <br />the ball mill. Fresh water will also be added to the thick- <br />ened pulp as it passes from the thickener tanY, underflow to <br />the flotation concentration circuit. A closed circuit has <br />been planned to recycle ~r,~ water that will accompany the <br />tailings pumped from the mill to the tailings retention <br />structure. The excess water that accumulates in the tailings <br />pond will be decanted from the water pool and stored under- <br />ground in the Hazel A. adit. A steel pipe with water decant <br />holey will be used to remove the excess water that collects in <br />the tailings pond. This decantation line will be used to <br />control the water level in the tailings pond, ar~d to keep the <br />water pool as far as possible from the crest of the embank- <br />ment. Additional sections of steel pipe will be connected to <br />the decantation line to regulate the elevation of the water <br />pond as the tailings dam's height is increased. Several seep <br />rings will be attached to the steel pipe to pre~~_nt the <br />tailings from piping along the decantation line. TI••_ decan- <br />tation line ~~ill be connected -with the Hazel A. adit through <br />one of the *_^st holes that were drilled by the U.S. Bureau of <br />Mines. This underground storage area will be used to clarify <br />the decanted water by allowing it to settle prior to recycling <br />the water through the mill. It will also provide additional <br />reservoir capacity for the excess water removed from the <br />tailings pond. <br />The amount of water that will be decanted and stored under- <br />ground in the Hazel A. adit will be primarily determined by <br />the water balance maintained throughout the processing and <br />impoundment system. The water consumed in the milling process <br />and lost in evaporation from the tailings pond is not expected <br />to exceed 20 percent of the water used in the mill. The water <br />consumed in the ore m'_11ing process will mainly: result from <br />water entrapped in the gravity and flotation concentrates and <br />in the unconsolidated tailings. Because of the altitude and <br />limited size of the tailings pond, only a relatively small <br />a:,~:~unt of water is expected to be lost due to evaporation. <br />Recycling the mill water will reduce the amount of fresh water <br />needed in the milling process, and decrease the quantity of <br />water pumped from Left Hand Creek. <br />Because of the hillside location selected for the tailings <br />impoundment structure, water runoff inflow will not be sub- <br />stantial. A drainage diversion ditch will be excavated above <br />the tailings pond to intercept surface water runoff and convey <br />it away from the tailings impoundment area. _ <br />A seepage collection ditch will also be excavated around the <br />downstream perimeter of the tailings embankment dam. The <br />water that collects In this ditch will be conveyed by a <br />pipeline to the Hazel A. adit for underground storage and will <br />be recycled through the milling facility. <br />-15- <br />