My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48692
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48692
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:25:21 PM
Creation date
11/23/2007 4:30:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Name
Proposed Decision & Findings of Compliance
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-z- <br />PROPOSED DECISION <br />COLOWYO COAL COMPANY <br />COLOWYO MINE <br />The Colorado Mined Land Reclamation Division proposes to approve, with <br />stipulations, an application for a permit to conduct surface coal mining <br />and reclamation operations submitted by Colowyo Coal Company for the <br />Colowyo Mine. The proposed approval applies to a permit area that <br />encompasses 5,550 acres in Sections 2, 3, 4, 9, 10, and 11 of T3N, R93W <br />and Sections 13, 22, 23, 24, 26, 33 and 34 of T4N, R93W as identified <br />on Map32 of the application. <br />This approval decision is based on a finding that the proposed operation <br />will comply with all requirements of the Colorado Surface Coal Mining <br />Reclamation Act, C.R.S. 1973, 34-33-101 et seq:., and the Regulations <br />promulgated thereunder. <br />The permit application and the stipulations will become a binding part of <br />the permit upon approval. The stipulations for the Colowyo mine are as <br />follows: <br />Stipulation No. 1 <br />WITHIN SIX MONTHS OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT A <br />REVISED SURFACE WATER MONITORING PLAN SUFFICIENT ~ VERIFY THE <br />PREDICTED EFFECTS OF MINING ACTIVITIES. SPECIFICALLY, THE PLAN <br />WILL ADDRESS MONTHLY MEASUREMENTS OF FLOW AND FIELD PARAMETERS <br />ON GOOD SPRING CREEK AND TAYLOR CREEK, IN ADDITION TO THE POND <br />DISCHARGE SAMPLING AND QUARTERLY STREAM SAMPLING AS SPECIFIED IN <br />THE APPLICATION. THE LOCATION OF ALL MONITORING STATIONS SHOULD <br />BE INDICATED ON A MAP. THE MONI~RING PLAN WILL BE SUBJECT TO <br />APPROVAL BY THE REGULATORY AUTHORITY. <br />Stipulation No. 2 <br />WITHIN TWO MONTHS OF PERMIT ISSUANCE, THE PERMITTEE MUST PRESENT <br />INFORMATION TO THE DIVISION DEMONSTRATING THAT THE WORK AREA SEDIMENT <br />POND IS CAPABLE OF RELEASSNG STORED WATER IN EXCESS OF TWO ACRE-FEET <br />WITHIN 36 HOURS, OR SUBMIT AN APPROPRIATE APPLICATION FOR A COURT <br />APPROVED AUGMENTATION PLAN TO REPLACE THE WATER STORED OUT OF PRIORITY, <br />Stipulation No. 3 <br />ALL NECESSARY AIR QUALITY PERMITS FOR PRODUCTION AT 4.5 MILLION <br />TONS PER YEAR 6JILL BE OBTAINED BY THE PERMITTEE PRIOR ~ EXCEEDING <br />4.0 MILLION TONS PER YEAR. <br />
The URL can be used to link to this page
Your browser does not support the video tag.