My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48596
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48596
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:25:12 PM
Creation date
11/23/2007 4:25:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
General Documents
Doc Date
2/3/2003
Doc Name
2002 Annual Report Letter
From
Stormwater Permit Folder
Permit Index Doc Type
Reclamation Project
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER ANNUAL REPORT-METAL MINING (& COAL) <br />COLORADO DEPT. OF PUBLIC HEALTH & ENVIRONMENT <br />Water Quality Control I}ivision <br />WQCD-P-B2 <br />4300 ChenyCreek Drive South <br />Denver, Colorado 80246-1530. <br />Make enough copies ofform for each reporting year. Or go to <br />http:/fwww.cdphestate.co.us/wq/Permits Unitfwgcdpmt.htmd Check box if this is a <br />new name, address, etc. . <br />Permittee(CompanyName): ~'vLy2.tOo ,J~rvrsr~•- '~~ /`7i,.-cnrCS ~G~>(~~-y <br />Facility Name: Cv.~-t_ /iHi'rN - ~~cC,e,~,,rna.•~ e~~.-s~~on,.- l~n~&-~-TT <br />MailutgAddress: 13 f3 S (~-R~,.. s T '`~ ~,t f 17e.~.ve/L, e~CdR9>!~ Ir~tu3 <br />Facility Phone Numbet: (3~ 3 ) ~ G 6 - 3 S"r ')- <br />Pemut Certification No. COR-04 0 }. a ¢ <br />Reporting Period: Jan. 1-Dec. 31, 20 v. ?- (Form is due by Feb. I S of the following year) <br />**Eacb section must be completed. Please print or type.** <br />A. A report on.the facility's overall compliance with the SA'MP. (Include here a summary of any measures taken <br />to comply with your Stormwater Management Plan (SWMP), to fully implement it, changes or improvements made <br />in any of your Best Management Practices (BMPs), employee training, spHls, other problems encountered, etc. <br />How is your plan working?) <br /> <br />Were changes'made to your SWMP?' ~ (~T ~ Yes -Describe changes on a separate sheet. <br />B. A summary of each comprehensive stormwater facility inspection made, including date. findines. and action <br />taken. (The pernrit requires at least two comprehensive facility inspections per yeaz -see page 8 of the pemrit. <br />Include here a summary of those inspections, glus any other comprehensive inspections made. It is not necessary <br />to c~,m,;iari,e day-to-day inspections, unless significant problems were noted.) <br />First Inspection -Date. s/ / or: Findings, and action taken: <br /> <br />Note -form may be reproduced ~ Pie I of 2 ~ ~ _ ~ ~ wva~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.