Laserfiche WebLink
STATE OF <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman 6t., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />fAX: (303) 832-8106 <br />August 19, 2003 " <br />®ENVER <br />OFFICE <br />COLOlZADO <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />Bill Owens <br />Governor <br />Stephen C. Fearn Larry Perino ~ Oreg F. watcher <br />Gold King Mines Corporation ~ Sunnyside Gold Corporation E%PC0'Ne °1feCOf <br />Ronald W. Cattany <br />P.O. Box 299 P.O. Box 177 Acting Division Director <br />Silverton, CO 81433 Silverton, CO 81433 <br />RE: DMG Acceptance of Bulkhead Design at Mogul Mine, ~ R <br />Consent Decree and Order, Case 94 CV 5459, = AU ~~®~'~ <br />Sunnyside Mine, Permit No. M-1977-378. ~ p;,,; . G ZS 2~ <br />Dear Mr. Fearn and Mr. Perino: Sro~orMrnerafsan~`em~gg. <br />On August 15, 2003, DMG completed its review and accepted the proposed designs for a <br />bulkhead in the Mogul Mine tunnel. John F. Abel, Mining Engineer, prepared the bulkhead <br />designs. Please find enclosed, copy of DMG staff memo regarding DMG review of the <br />j submitted bulkhead designs. <br />Per your request, DMG has scheduled apre-pour inspection of the bulkhead preparations for <br />Tuesday, August 19, 2003, beginning at 1400 hours. <br />Please contact me at the DMG Durango Office, 701 Camino del Rio, Room 125, Durango, <br />CO 81301, phone (970) 247-5469, if you have any questions. <br />Sincere~L~' • ~'~ <br />GUJ C"~- <br />Wallace H. Erickson <br />Environmental Protection Specialist <br />Enclosure: DMG memo from James Dillie, dated August 15, 2003. <br />cc: Harry Posey, DMG <br />James Dillie, DMG <br />