Laserfiche WebLink
<br /> <br />Geld Hill Mlll Storm Water Mamgemrt Plea Oet•ber 7A, 1995 <br />a SpNt Prn+auiorr and Rrrportss Proeedrrre <br />The location of facilities end activities where spills might oavr ere shown on Exhibit B. <br />The designs end procedrues to prevent spills ere desaibed above. The primary sources of <br />poterutsl spills aR oil, lubncertu, and fuel for equepmem, end any breaks in the process <br />water lines which rnuld spill tatlittg~ sands. <br />In both types of spill, the SWMO Administretorwill be notified artd the DMG grill be <br />notified of any tailings spills. 1n both cases, the spill will be cleaned up by excavating <br />the spilled materiel end the contaminated soil. Tailings spills end affected soils trill be <br />returned to the tailings pond and excavated petroleum spills will be disposed of et s <br />oettifiod lettdfiil. Shovel, buckets end any other equipment needed for clean up will be <br />stored at the mill building <br />E Boot bfarragarert Pracdoea <br />PRACTICE EMPLOYED AREA WHE14E PRACTICE IS EMPLOYED DATE OF <br />IMPLEMENTATION <br />eyetatlon <br />Ma amertt <br />Tam ra Seedin T 1 stoc ilea Late 1080'a <br />Rev elate as Praetlgl Taif(n s embankmertL area east of mill 1984 <br />Water Man emertt IrrtaMm Measures <br />Straw Bales Area around sediment and diversion ditches 199Ci-1995 <br />Water Manes emertt PermanaM Structural Controls <br />Overland Flaw Routin Water rotttin below sediment 1982 <br />On-sots Flow pivsrsion Diversion ditches above tails Late 1880's <br />Flow Store 'on Tailin s Late 19tI0'a <br />Benni Bann above tails Labe 1980's <br />Sediment Traps Sediment ~ in Ares 2 ~ d tailinOs 1082 <br />InRlaaGOn Area French drains in Area 1 below waste <br />dum Late t8t30's <br />Ri Ra Sediment fta autlafl 1908 <br /> <br />g En+ployee Edrreadar <br />TrainirsQ which explores the goals rwd basic compartatb of the SWMP will be <br />conducted for upper level menagemerrt on en annual basin. The trsinirtg will utciude: <br />• Spill Ptevartion <br />• Spill Response <br />• Good Housekeeping Techniques <br />• Materials Menegement <br />• Sediment and Erosion Prrvcuion <br />While operations ere conduced on-site, it will be the ttepormibility of the mill mmtager to <br />train appropriate an-siu personnel so that the gortls of the SWMP will be achieved <br />h. Ttitiag jot NonSrarerworo <br />The process. water system is designed to prevent non stormwater discharge kom mixing <br />with stotrttwater discharges that Leave the property. These ere no sprirtga with'vt the <br />