Laserfiche WebLink
<br />Caid HBI MW Storat Waaer Maaapaeat PIS Oetaber 24, 1943 <br />chemials when thry are added to the ore during processing Wash down water currently has <br />the potential to flow door openings, All door openings affected by wash down water or spills <br />firm tanks will have a concrete lip installed before the mill begiru operations again to <br />prevent waatt water and tank spills from leaving the building All floor drains in the building <br />are piped to the tailings pond <br />Tailings and process aster fiom the thidtma ate piped from the mill building to the tailings <br />pond in a boned pipe w the tailings pond. The tailings pond is timed with a high density <br />polyethylene liner to contain ell tailings end proceu water. There is a potential for a spill if <br />the tailings line u kept too close to the top of the tailings pond embarrl®errt and thers is a <br />break N the spigoting line. the tailings spigotireLt line will be leapt off the top of the <br />embrfftkrttent artd on the vuide of the tailings mrtbanlanent <br />All oils and greasd ere stored in the mill building in closed container. Diesel fuel fair the <br />equipment u brought in portable tetks in pickups a a portable fuel trailer. There u some <br />potenrial of spills of fuel and lubricating oil while maintaining vehicle in the meirttatartce <br />area There is eLw a potential for crcgting suspended solids fi+om the use of an unpaved area <br />All storm water in this area rtaatlteast of the trill (Area 3) w directed W the seditttertt trap in <br />Area 4. <br />The otaslope of the tailings pond, trrpsoil storage Piles, and a distuttied area southesa. of the <br />mill have a potential for adding suspended solids to slam water nmoff. The arm have beat <br />revegetatad W decease the potential fa devetopittg suspended solids during storau. in <br />addition, a sediment trap u located a< the bottom of the roadway east of the tailings pond and <br />southesst of the mill building w amtsin suspatded solids dttrirtg stortm_ <br />Storm walla tiom the tailings pond is decanted fre® the tailings pond through a 2-ia <br />diameter pipe to the f3aael A mime edit below the tailvtgt paid: The wale is stored behind <br />the bulkhead fa. rstne a process water in the mill. A bralc in the decmtt line a return <br />prt>cess line could releax wetas that might contain heavy metals a dissolved solids. <br />SIGPITFFICAIVT SPILLS dE LEAKS OF TOXIC OR HAZARDOUS SUBSTA,iVCES <br />Dab II or Ltak <br />date Oil spilled on Around in compressor shed on northeast sire d mil4building. All dl aabrratsd <br />unknown loll iebsi rerttored. <br />8J94 Tailings line broke on tailings embankment allowing tailings bo flow down outsbps of tailing <br /> embankment Approximately 50 gallons of tailings wsro irnohrod. The Ilne was repairod <br /> and trill sands were cleaned u and robrmed m the twill d. <br />t185 Water stored in Hazel A edit leaked thraph bulkhead and flawed down Cash Guk:h. <br /> Unknown quantity of worst discharged. Bulkhead repaired, and a aeoondary coffer dam and <br /> pump installed to contain any leakage hem bulkhead. Leakage water periodkaly pumped <br /> back behind tits bulkhead. <br />1Ur17/96 Water stored in Hazel A edit siphoned tltnxrgh suctlon line in tits secondary pump back <br /> system and flowed down Cash Gulch. 200 to 500 galkxra d water were irr~olvsd. Suction <br /> line to be romwed after min . <br />