Laserfiche WebLink
1 <br />REVISED BID SCHEDULE (AUgu et 9, 1993) <br />i <br />G.E.C. - Orphan Pit - Bond Revocation Project <br />RN-COAL-NINES - 8 UNIT <br />ITEM DESCRIPTION QTY UNIT PRICE AMOUNT <br />1. Mobilization/Demobilization 1 Job NA ~S(.rin n,0 D <br />per specifications -~~- <br />2. Pond Cleanout, per specifications ~~ <br />A. West Pit 1 Job NA '~ DO~~ O ~ <br />B. Pond A 1 Job NA ,~ ~ OD O, p O <br />3. Drainage Stabilization, <br />per specifications <br />A. Magpie Creek Diversion 1 Job NA ~ 0 ODO~ D o ~'~Ji <br />B. Duck Pond Pit ~ 1 Job NA ~y ~ n e o D o -~ <br />C. West Plt Diversion 1 Job NA ,~ I~ noo,p •o ~ ~ <br />~ D. No`Name Drainage (Task Removed) <br />4. Additional Drainage Stabilization <br />(Task Removed from Bid Schedule) <br />5. General Earthwork, <br />per specifications <br />A. Orphan Pit 1 Job NA x'17 /1 I1 o.0 0 <br />B. Duck Pond Pit 1 Job NA ,fy "~N II nno.0 <br />C. Tipple Pond 1 Job NA ~g~7"~'~ I n n n, 0 "o <br />D. Gully Repair ~T"'~~ <br />- G.E.C. West Pit 1 Job NA ~'T 0 0,0 D e <br />- Hastings Strip 1 Job NA B T nc•D ~ <br />- North Mine (Task Removed) <br />6. Topsoil Replacement, 1 Job NA ~~ OOp•0 ~ <br />per specifications _ <br />7. Revegetation including seedbed preparation, 1 Job NA ~ yrfj0 0.6 a <br />delivery and application of fertilizer, <br />straw mulch and seeding; <br />per specifications. ~ <br />8. Equipment Rental- Dozer CAT DBN or 285 HP 30 Hours X5,00 ~t,~b• D ~ <br />equivalent with operator, if required -7 <br />9. Add itionai Rip-Rap Material, if required 20 cY ~ Q,co ~ 0.0 O <br />by PROJECT MANAGER ~~~~~~ uuu ~~1 EGG nnn <br />GRAND TOTAL (Enter here and on Invitation and Bid Schedule) $~• ~ ~ <br />c `r~ THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br />k~LA~"y~. ~G/ <br />Page 1 of 1 Page ~ ~ ~ ~~ U~ <br />. ~~~~5 c~c. raw ~~5 ~/~o <br />`~ ~1;~'~ v ~y/~ls~ ~33,c~ ~Fl~v ~1°u~~~Ffi~~ vti~'~ <br />/~1 9i~ Z~ .~-~j~~ ~ SUD 1'~u~P~~"~~1 e~'~Qt)° ~,~`~ o~~ <br />~~ <br />