Laserfiche WebLink
i <br />~~ s • <br /> _ <br />LIST OF TABLES ~'`-'°~~ ^"~ ~' <br /> <br /> <br /> <br />• TABLE <br /> APR 2 B iggs <br /> NUMBERS <br /> 2.1-1 Equipment List ~j~ F~!~~`•~~,~+?rry~+,?.,~}~-B~'~ <br /> rria. ~7a~3. a9 ~;^t;sr~;i rFs~i~rrrc <br />~ 2.2-1 Construction and Disturbance Timing <br />i 2.2-3 Stability Analysis - Line 1 at Station 103+00 <br /> 2.2-4 Stability Analysis - Line 2 at Station 97+00 <br /> 2.2-5 Stability Analysis - Line 3 at Station 90+00 <br />I <br />2.5-1 <br />Surface and Ground Water Monitoring <br />. Z.5-2 Baseline Water Quality Monitoring <br /> 3.3-1 Depths of Suitable Topsoil Material Available <br />~~ 3.3-2 Volumes of Material to be Salvaged Along Road Alignment <br /> 3.3-3 Volume of Material to be Salvaged at Waste Rock Site <br /> 3.3-9 Chemical Analysis of Surface Layer at Mine Site <br />• 3.4-1 Revegetation Seed Mix <br /> 3.7-1 Reclamation Costs <br /> 3.7-2 Reclamation Timetable <br />• 4.1-1 Test Pit TP 1 <br /> 4.1-2 Test Pit TP 2 <br /> 9.1-3 Test Pit TP 3 <br /> 9.1-4 Test Pit TP 9 <br /> 4.1-5 Test Pit TP 5 <br /> 4.2-1 Core Laboratories Analytical Report - Roof and Floor <br />' 9.2-2 Drill Hole Information Summary <br /> 4.3-1 Coal Quality Data, Permit Area And Vicinity <br /> 4.3-2 Surface Drilling Results in and immediately Adjacent to <br /> Permit Area <br />• <br /> 9.9-1 Water Quality Sampling Analysis, by Sample Date; Well 1 <br /> 4.4-2 water Quality Sampling Analysis, by Sample Date; Well 2 <br /> 4.4-3 Water Quality Sampling Analysis, by Sample Date; Well 4 <br />