My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48514
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:25:04 PM
Creation date
11/23/2007 4:22:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
10/23/1992
Doc Name
Stip. 43 Response letter
From
DMG
To
MOUNTAIN COAL CO
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iiiiiiiiiiiiiiiiiii <br />999 <br />STAT ~ OF COLORP~DO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Nalu ral Resources <br />1313 Sherman Sl., Room 215 <br />Denver, CO 80203 <br />Phone: 0031 866-3567 <br />FAY: (301) 8328106 <br />October 23, 1992 <br />Ms. Kathy Welt <br />Environmental Supervisor <br />Mountain Coal Company <br />P.O. Box 591 <br />Somerset, CO 81434 <br />RE: Stipulation Response; West Elk Mine; File No. C-80-007 <br />Dear Ms. Welt; <br />pF' ~O~ <br />cF - p <br />N~.s-~ '~ <br />~~8 T6 ~• <br />Roy Romer <br />Governor <br />.Michael B. Lang <br />Division Dueaar <br />The Division would like to remind you of the upcoming due date for <br />the "as-built" designs for all facilities on the site of the West <br />Elk Mine. Stipulation No. 43, was added to the permit upon the <br />approval of Technical Revision No. 59, which addressed the <br />reorganized permit application. The response to this stipulation <br />is due on November 20, 1992 and is worded as follows: <br />MUST SUBMIT "AS-BUILT" DESIGNS FOR ALL STRUCTURES AT THE WEST <br />ELK MINE SITE, INCLUDING, BUT NOT LIMITED TO: ALL SURFACE <br />FACILITIES, DEWATERING SYSTEM, PORTAL BENCH AND PORTAL <br />STRUCTURES, WATER TREATMENT PLANT, STORAGE TANKS, AND WASTE <br />WATER PLANT BY NOVEMBER 20, 1992. <br />The response to this stipulation should be submitted as a technical <br />revision. If the response cannot be submitted by November 20, <br />1992, please submit to the Division a letter of extension along <br />with the date you anticipate that these "as-built" designs will be <br />ready for submittal. <br />Please call if you have any questions. <br />ly, <br />Christine E. J <br />Reclamation So <br />ist <br />007.ST43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.