My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48506
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48506
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:25:03 PM
Creation date
11/23/2007 4:22:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
General Documents
Doc Date
6/17/1998
Doc Name
CYPRUS TWENTMILE SAMPLINE PROCEDURES
From
HABITAT MANGEMENT INC
To
DMG
Permit Index Doc Type
VEGETATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 1(4J80 <br />Section 816.116 (a) Continued. <br />P = Sampling precision expressed as an acceptable percent <br />error; 10% = 0.1, 20% = 0.2; <br />x = average value of all transect means. <br />After field sampling has been completed, a weighted average will be <br />generated for cover and productivity for all the range sites in the <br />affected area and for all the reference areas. Both a weighted <br />average and a pooled variance will be computed using the following <br />formulas (Wyoming Department of Environmental Quality, Land Quality <br />Division, Guideline No. 2, March 1979 Revision): <br />2 <br />2 <br />Nh xa S2 Na Sa <br />X = =f - <br />N N na <br />Where: X = percent cover or productivity for entire area <br />(Y = symbol for reference areas); <br />x = percent cover or productivity in range site; <br />a <br />N = acreage of range site a; <br />a <br />N = acreage of entire affected area; <br />S2 = variance for entire affected area; <br />52 = variance in range site a or in reference area a; <br />a <br />n = number of samples taken in range site a or reference <br />a <br />area a. <br />Separate values will be calculated for both the affected area and <br />the reference areas in the premine study and the reclaimed area <br />and the reference areas in the postmining study. These values will <br />be utilized in calculating a reclamation success standard. 'lhe <br />reclamation success standard Eor cover and production will be <br />determined using the equation: <br />816-157 (~) <br />
The URL can be used to link to this page
Your browser does not support the video tag.