Laserfiche WebLink
h1r John Hickman Page 3 <br /> Tanabe P:[ Substitute Water Supply Plan (t,,1-00-002) <br /> April 27, 2000 <br /> to include, but not be limited to, long-term evaporation losses. If a lined pond <br /> results after reclamation, replacement of lagged depletions shall continue <br /> until there is no longer an effect on stream flow. <br /> This plan shall be valid through March 31. 2002. Acceptance of these conditions will be assumed <br /> unless a letter to the contrary is received by this office within two weeks after receipt of this letter. <br /> If this plan is not made absolute by a court action by the expiration date, a renewal of this plan is <br /> required. Please contact Megan Sullivan in Denver at (303) 866-3581 or Dave Nettles in Greeley <br /> at (970) 352-8712, if you have any questions concerning this approval. We conclude that approval <br /> of this plan does not imply a position by our office on any litigation associated with this case. <br /> Sincerely, <br /> Kenneth W. Knox <br /> Assistant Slate Engineer <br /> cc: Dave Nettles, Assistant Division Engineer <br /> Robert Stahl, Water Commissioner <br /> Richard Raines. Tuttle Applegate, Inc. <br /> Mark McLean, Rocky Mountain Consultants. Inc. <br /> KW IVIASlmas C:TanabeM00002.doc <br />