Laserfiche WebLink
III IIIIIIIIIIIII III ~ STATE OFCOLO RADO =iCN<ar ,; L=:•n• Gf.e~ III IIIIIIIIIIIII'II <br />999 DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascoe. Executwe Director <br />~,.~ NIINED LAND RECLAMATION <br />423 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (303) 866.3567 <br />David C. Shelton <br />Director <br />December 1, 1982 <br />Albert Frei & Sons RECEIVED. <br />8400 Holly <br />Henderson, Colorado 80640 ,J ~ANp31983 <br />---~ MINfO l•~ND ~CI.AM'ATIDN ~ <br />COLO W ~. OF NAIIMA~ <br />Re: File No. 77-153 - RECLAMATION PIT #1 <br />Based upon our records, the anniversary date of your mining operation permit is <br />DecPmher 15 and annual fees for the year(s) 19$2 totalling <br />S 350.00 are due on that date. Fees are based upon a schedule of <br />5350.00 if the operation is an open mining operation of 10 acres or more and <br />5275.00 for any other operation IO acres or more. <br />• Also, to bring the Division up to date as to the mining and reclamation on the • <br />site, please submit a report and map (to a scale of not less than 100' to the <br />inch and not more than 660' to the inch), indicating the phases of the reclama- <br />tion plan which have been completed, correlated with the timetable. The report <br />and map shall contain the following information: <br />1) Location and number of acres affected during that year, <br />2) Locations and number of acres reclaimed for that year, <br />3J The location and number of acres in the various stages of reclamation <br />(back filled, graded, topsoil replaced, revegetated), <br />4) The species of vegetation planted, the locations and approximate dates <br />of planting, <br />5) The type and approximate quantity of fertilizers, organic material or <br />soil wnditioners used and Zocation of use, <br />6) An appraisal of the success of reclamation efforts, and in the event <br />of failure of any efforts, a short narrative on the suspected or determined <br />causes of such failure, <br />7) Estimates of the location and number of acres to be affected in the <br />coming year, and <br />8) The effective date of the information provided above shall be no more <br />than 45 days prior to the anniversary date. <br /> <br />• <br /> <br />