Laserfiche WebLink
Table 2 <br /> Surface Water Monitoring <br /> Site Name Discharge Water OualityA <br /> YSSF2 Continuous Monthly/Triannual <br /> YSSF3 Continuous Monthly/Triannual <br /> YSS2 Monthly Monthly/Triannual <br /> YSGFS Monthly Monthly/Triannual <br /> YSG5 Triannual• Trainnal° <br /> NPDES Sites See Page 25 <br /> Springs <br /> YSPG6 Semiannual Semiannual <br /> YSPG10 Semiannual Semiannual <br /> Discharge measurements (both continuous and monthly) will be conducted March - <br /> October only. <br /> Water Quality Monthly = field parameters only (pH, temperature, and electrical <br /> conductivity) , March through October only. <br /> Water Quality Triannual = Water samples will be analyzed according to the surface <br /> water parameter list as given in the permit in Table 15-5 during snowmelt runoff <br /> (April) , post-runoff (May or June) , and baseflow (September) . <br /> Semiannual is May/June and September/October, and includes field parameters and <br /> the list of parameters in Table 4 of this document. <br /> AIf flow is less than 5 gallons per minute, then only field parameters will be <br /> measured. <br /> •For site YSG5, triannual discharge measurements and water quality samples (total <br /> dissolved solides) will take place during May, July, and September. <br /> Yout Mine 41 October 19, 1999 <br />