My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-10-15_GENERAL DOCUMENTS - C1994082
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1994082
>
1999-10-15_GENERAL DOCUMENTS - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2021 5:08:40 AM
Creation date
11/23/2007 4:16:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
General Documents
Doc Date
10/15/1999
Doc Name
PROPOSED DECISION AND FINDINGS OF COMPLIANCE FOR (PR1)
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 <br /> Surface Water Monitoring <br /> Site Name Discharge Water OualityA <br /> YSSF2 Continuous Monthly/Triannual <br /> YSSF3 Continuous Monthly/Triannual <br /> YSS2 Monthly Monthly/Triannual <br /> YSGFS Monthly Monthly/Triannual <br /> YSG5 Triannual• Trainnal° <br /> NPDES Sites See Page 25 <br /> Springs <br /> YSPG6 Semiannual Semiannual <br /> YSPG10 Semiannual Semiannual <br /> Discharge measurements (both continuous and monthly) will be conducted March - <br /> October only. <br /> Water Quality Monthly = field parameters only (pH, temperature, and electrical <br /> conductivity) , March through October only. <br /> Water Quality Triannual = Water samples will be analyzed according to the surface <br /> water parameter list as given in the permit in Table 15-5 during snowmelt runoff <br /> (April) , post-runoff (May or June) , and baseflow (September) . <br /> Semiannual is May/June and September/October, and includes field parameters and <br /> the list of parameters in Table 4 of this document. <br /> AIf flow is less than 5 gallons per minute, then only field parameters will be <br /> measured. <br /> •For site YSG5, triannual discharge measurements and water quality samples (total <br /> dissolved solides) will take place during May, July, and September. <br /> Yout Mine 41 October 19, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.