My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48353
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48353
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:24:39 PM
Creation date
11/23/2007 4:16:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
6/20/1981
Doc Name
OUR FN C-037-81 77-48 MINING PLANS PROPOSED TR RECLAMATION PLANS ACTIVE MINING AREAS CANON NATIONAL
From
GEC MINERALS INC
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br />.r _ ga 999 vL~: MINERALS, 1NC. <br />FLORENCE, COLORADO 81226 .I;!O;slle a'~89;~ <br />- P.O. BOX 225 <br />MINED LAND RECLAMATION-COAL' <br />COLO. DEP I. Of NATURAL RESOURCES <br />June 20, 1981 <br />Mr. Peter Evans <br />Reclamation Specialist <br />Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman <br />Denver, Colorado 80203 <br />Re: Our File No. C-037-81 (77-48) <br />1) Mining Plans - Proposed Technical Revision <br />2) Reclamation Plans - Active Mining Areas <br />- Canon National ("prospecting") Pit <br />- North Orphan Pit <br />3) New Application Review <br />Dear Peter: <br />Pursuant to your request, we are submitting the enclosed in- <br />formation on behalf of GEC Minerals, Inc. More specifically, <br />these contents contain Mining Plans - Proposed Technical <br />Revision; Reclamation Plans (A, B and west area), Prospecting <br />pit, Diversion ditch for prospecting pit, Subject area, Orphan <br />pit, N. Orphan pit, Thumb area, and current mining area; as <br />well as New Application ,Review. <br />MINING PLANS -Proposed Technical Revision. <br />These issues are addressed in the Proposed Technical <br />Revision, File #C-037-81 (77-48), dated May 28, 1981. Basically.- <br />the overburden handling techniques will be exactly the same as <br />described in the approved application #77-48. The only Change <br />.. will be the mining direction, instead of in a Southerly direction, <br />the new. mining direction will be mined from both East and West <br />toward the center portion where the #2 coal seam has been mined <br />out by previous underground operation, therefore no operation <br />will be carried out over the central portion. (Green Area - <br />the attached map I). A total of overburden/interburden material <br />to be removed are as shown on the same map. They are 198, 117 BCY <br />from West side, 177, 185 BCY from the East side and are hauled <br />directly to the backfill area which are approximatly 500 feet <br />away from the pit and have already been mined recently. This type <br />of stripping similar to the "Contour Stripping" method, however, <br />there will have no slope reduction involved, was owing to all of <br />the spoil material will be hauled and back-filled immediately for <br />:~. <br />~` .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.