Laserfiche WebLink
Attachment A <br />Colorado Coal Mine No. 1 <br />List of Stipulations <br />Stipulation No. 1 <br />THE PERMITTEE SHALL ESTABLISH A TOTAL OF FIVE SURFACE WATER <br />MONITORING STATIONS AT THE MINING SITE. THESE SHOULD BE LOCATED AT <br />THE FOLLOWING POINTS: UPSTREAM OF THE MINING OPERATION ON THE <br />MAITLAND AND GORDON ARROYOS AND THE UNNAMED TRIBUTARY OF THE <br />MAITLAND ARROYO AND DOWNSTREAM OF THE MINING OPERATION UN THE <br />MAITLAND AND GORDON ARROYOS. <br />THESE FIVE STATIONS SHALL EACH BE MONITORED IN THE FOLLOWING <br />MANNER: 1) A UAILY RECURU OF THE OCCURRENCE OF FLOWS IN ALL STREAM <br />DRAINAGES (e. g. WAS THERE ANY FLOW?); 2) A DAILY DEPTH OF WATER <br />READING; 3) A WEEKLY MEASUREMENT OF PEAK FLOWS; 4) MONTHLY FIELD <br />MEASUREMENTS OF pH, ELECTRU-CONDUCTIVITY, AND TEMPERATURE DURING A <br />PERIOD OF SNOWMELT AND/OR DURING THE FIRST PRECIPITATION EVENT <br />OCCURRING IN THE MONTH; AND 5) A MINIMUM OF THREE WATER QUALITY <br />SAMPLES FOR EACH OF THE STATIONS SHALL BE COLLECTED NNNUALLY. ONE <br />SHALL BE COLLECTED UURIfVG SNOWMELT, ONE DURING A PRECIPITATION <br />EVENT IN MIDSUMMER, ANU ONE DURING A PRECIPITATION EVENT AT THE ENU <br />OF SUMMER. FIELD PARAMETERS OF pH, ELECTRO-CONDUCTIVITY, <br />TEMPERATURE, ANU FLOW SHALL BE TNKEN PRIOR TO SAMPLING AS DESCRIBED <br />ABOVE. THEN THE SAMPLES MUST BE AfVALYZEU IN A TIMELY MANNER FOR <br />THE FOLLOWING PARAMETERS (TOTAL ION CONCENTRATIONS IN mg/1): <br />TOTAL DISSOLVED SOLIDS NITRATE-NITRITE <br />TOTAL SUSPENDED SOLIDS PHOSPHATE <br />OIL AND GREASE ALUMINUM <br />SODIUM ADSORPTION RATIO ARSENIC <br />CALC I U~~1 BARIUM <br />POTASSIUM COPPER <br />SODIUM IRON <br />BICARBONATE LEAD <br />CARBONATE MANGANESE <br />CHLORIDE MERCURY <br />SULFATE MOLYBDENUM <br />AMMONIUM SELENIUM <br />FLUORIDE ZINC <br />ALL SAMPLES SHALL BE COLLECTED, PRESERVED, AND ANALYZED <br />ACCORDING TU U. S. E.P.A. METHODS. <br />ALL RESULTS AND DATA COLLECTED FUR THE MONITORING PROGRAM SHALL <br />BE SUBMITTED TO THE DIVISION ON A QUARTERLY BASIS, BEGINNING ON <br />THE 4th MONTH AFTER PERMIT ISSUANCE. <br />