Laserfiche WebLink
Table 1-Summa of Histo of Permit C-81-044 <br />Date Permit Action <br />9/2/83 Permit revision granted for consolidated information and for additional <br /> minin in No. 5 Mine, but not for additional minin in No. 9. <br />4/9/84 A royal ranted to conduct additional minin in No. 9 Mine. <br /> Permit Revision application PR-01 submitted for changes in operations: <br /> implementation of longwall system, addition of 5A portal, approximate <br /> 430-acre increase in permit area (Utah Tract), and opening a new mine, <br />4/30/87 the No. 6 Mine (in the E seam, to be accessed through the SA portal). <br /> Permit acreage increased from 6,176 acres to 6,820 acres. Surface <br /> disturbance remained at 375 acres. No further mining in P seam as No. 9 <br /> Mine had been sealed. <br />1/9/88 Permit Renewal RN-Olapproved with operator change from Empire <br /> Ener Co . to C rns Em ire Co <br />2/20/90 Bond release a roved for the 20-acre town loadout in Crai . (SL-O1) <br />2/28/94 Permit Renewal RN-02 a roved. <br />8/95 Minin ceases (entered tem or cessation status 12/3/95) <br />1997 Mine No. 5 Portals Sealed <br /> Permit transferred from Cyprus Empire Corporation to RAG Empire <br />3/22/00 <br /> Co oration, SO-1 <br />10/23/00 Permit Renewal RN-03 a roved. <br />2003 SA Portals sealed <br />12/16/03 Permit Renewal RN-04 ro osed decision <br />1/16/04 Permit Renewal RN-04 proposed decision withdrawn due to insufficient <br /> documentation of the permittee's right-to-enter a portion of the permit <br /> area. <br />5/27/04 RAG-EC submitted an application (SO-02) for a transfer of ownership to <br /> BTU Em ire Co oration (BTU EC). <br />8/17/04 BTU EC enters into legal proceeding against landowner of property with <br /> the dis uted ri ht-of-ent concerns. <br />1/4/06 Resolution of legal proceedings with landowner filed with Moffat County <br /> Clerk and Recorder. <br />1/25/06 Copies of legal resolution provided to CDMG. <br />5/26/06 The Division proposed to approve the permit transfer to BTU Empire <br /> Co oration. <br />6/2006 The Division directed BTU EC to update potential impacts to <br /> Threatened and Endan ered s ecies. <br />9/28/2006 The Division updated a reclamation cost estimate for the Eagle Mine and <br /> forwarded a co to BTU EC. <br />11/22/2006 BTU EC submitted updated information for Threatened and Endangered <br /> s ecies. This information was forwarded to OSM b the Division. <br />1/26/2007 The Division received OSM's consultation regarding Threatened and <br /> Endan ered s ecies. <br />