My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48208
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:24:09 PM
Creation date
11/23/2007 4:10:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
General Documents
Doc Date
3/17/1993
Doc Name
RESPONSES TO 2/26/93 MEMORANDUM WYOMING FUEL CO BASIN RESOURCES GOLDEN EAGLE MINE PN C-81-013
From
DMG
To
LAS ANIMAS CNTY PLANNING & LAND USE OFFICE
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br />Stipulation No. 50 requires that an archaeological study of the 5674-acre <br />addition to the original mine permit area, added by Permit Revision No. 1, be <br />performed before mining occurs in that new area. No mining has occurred in <br />this area to date. Question 2C (page 8) of the Midterm Review incorrectly <br />stated that the stipulation applied to the entire area north of the Purgatoire <br />River. This was incorrect because part of the original permit area exists <br />north of the river also. Mining may proceed within the original permit area <br />boundaries, including that portion of the original area that lies north of the <br />river, without the permittee having to comply with Stipulation No. 50. <br />Stipulation Nos. 51, 52, and 53 were part of the June 1990 Midterm Review. <br />All three stipulations involve secondary, or retreat, mining in Wet Canyon. <br />As of this date, mining has not occurred in this area as well. The <br />easternmost extension of mining occurring north of Highway 12 lies about 1 1/2 <br />miles west of Wet Canyon. <br />The Division appreciates the input from your office concerning our most recent <br />Midterm Review of the Golden Eagle Mine. We hope we have responded <br />satisfactorily to your office's inquiries. If you have any further questions, <br />please call or write to us. <br />Sincerely, <br />~• <br />h oseph J. Dudash <br />Reclamation Specialist <br />JJD/amm <br />cc: Dan Hernandez (DMG) <br />Jim Tatum <br />Charles Baldwin <br />6737E <br />
The URL can be used to link to this page
Your browser does not support the video tag.