My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48188
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48188
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:24:06 PM
Creation date
11/23/2007 4:09:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
General Documents
Doc Date
8/1/2001
Doc Name
CDPS General Permit Authorization to Discharge Under the Colorado Discharge Permit System
From
Stormwater Permit Ponds Folder
Permit Index Doc Type
Reclamation Project
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I Page 6 of 20 <br />Permit No. COR-040000 <br />B. STORMWATER MANAGEMENT PLAN -ACTIVE MINES (cont.) <br />Area Subiect to Effluent Limitations Guidelines <br />Each plan shall describe the portion of the mining site which contributes runoff to azeas subject to effluent limitations <br />guidelines contained in 40 CFR subchapter N. <br />Site Maa <br />Each plan shall provide a site map or maps which indicate at a minhnum: <br />- mining/milling site boundazies and access and haul roads; <br />- equipment storage, fueling and maintenance areas; <br />- materials handling areas; <br />- azeas used for storage of overburden, materials, soils or wastes; <br />- azeas used for outdoor manufacturing, storage or disposal of materials; <br />- location of mine drainage or any other process water; <br />- tailings piles/ponds, both new and pre-existing; <br />- mine drainage or any other process water discharge points; <br />- springs, streams, wetlands and other surface waters; and <br />- boundazy of azea that contributes runoff to outfalls that are subject to effluent limitations guidelines. <br />For those areas outside of the area that contributes runoff to outfalls that aze subject to effluent limitations <br />guidelines: <br />- an estimate of the direction(s) of surface flow; <br />- stormwater outfalls and an outline of the drainage azea of each stormwater outfall; <br />- each existing structural control measure to reduce pollutants in stotmwater runoff; and <br />-the location of impervious structures (e.g. pazking lots, roofs, etc.) <br />4. Stormwater Management Controls <br />Each mining operation certified under by this permit shall develop a description of stormwater quality convols <br />appropriate for that site, and implement such controls. The appropriateness and priorities of controls in the plan shall <br />reflect identified potential sources of pollutants at the mining site. The description of stormwater quality controls shall <br />address the following minimum components, including a schedule for implementing such controls: <br />a. SWMP Administrator -The SWMP shall identify a specific individual or individuals within the nvning <br />organization who is responsible for developing the SWMP and assisting the mine operator in its implementation, <br />maintenance, and revision. The activities and responsibilities of the administrator shall address all aspects of the <br />facility's SWMP. <br />b. Identification of Potential Pollutant Sources and Best Management Practices -The SWMP shall identify <br />potential sources of pollutants at [he site, and assess the potential of these sources to contribute pollutants to <br />stotmwater dischazges associated with mining activities. The SWMP must also describe appropriate Best <br />Management Practices (BMPs) to reduce the gotential of these sources to contribute pollutants to stormwater <br />dischazges. At a minimum, each of the following shall be evaluated for the reasonable potential for contributing <br />pollutants to runoff: <br />- loading and unloading operations; <br />- outdoor storage of chemicals or equipment; <br />- outdoor milling or processing activities; <br />- historic mine drainage; <br />- tailings ponds; <br />- crushing facilities or significant dust and particulate generating activities; <br />- on-site waste disposal practices; and <br />- stockpiles of overburden, raw material, intermediate products, byproducts, finished products or waste <br />products. <br />
The URL can be used to link to this page
Your browser does not support the video tag.