My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48188
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48188
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:24:06 PM
Creation date
11/23/2007 4:09:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
General Documents
Doc Date
8/1/2001
Doc Name
CDPS General Permit Authorization to Discharge Under the Colorado Discharge Permit System
From
Stormwater Permit Ponds Folder
Permit Index Doc Type
Reclamation Project
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DEPARTMENT OF PUBLIC HEALTH & ENVIRONMENT -Water Quality Comrol Division <br />Rationale -Page 7 Permit No. COR-040000 <br />VI. TERMS AND CONDIT/ONS OF PERMIT (cont. ) <br />Additional SWMP Requirements for Sites Seekin~2 Permit Terminations In the event that the penninee wishes <br />to remediate an inactive mine site and terminate permit coverage, prior to retnediation activities, the SWMP <br />must be amended to include the following items, and the permittee must notify the Division of the change in <br />status. <br />e. Additionalltems <br />1) Documentation of land owner permission (if the penninee is not the owner) <br />2) Photographs <br />3) Description of remedial action to be performed <br />4) Description of BMPs during remediation activities <br />5) Procedures for disposal of any water stored within mine waste <br />6) Description of permanent BMPs to be used, Etna! site stabilization, and ultimate land use <br />3. SWMP Develoomem, Coordination and Format <br />Some activities required under the SWMP may already be in place. However, the SWMP will require the <br />penninee to coordinate these activities with any necessary new activities in an orderly manner, so that the <br />result is the reduction or elimination of pollutants reaching state waters from areas not !trailed by numeric <br />effluent limitations. <br />Ir is the pennittee's responsibility to notify the Colorado Division of Minerals and Geology (CDMG) of any <br />changes at their site resulting from the implementation of the SWMP. This notification allows the CDMG to <br />review the SWMP and incorporate any potential revisions which might be needed into the facility's reclamation <br />permit. It is important to verify that the site reclamation permit matches the SWMP. Such information is <br />usually contained in Exhibit G of 110 reclamation permits. <br />The SWMP may rely upon information developed for other similar pollution control programs such as the SPCC <br />(Spill Prevention Control and Countermeasures) plan, Voluntary Cleanup PGtn, or the Mined Land Reclamation <br />Plan. Appropriate portions of these other plans may be incorporated in the SWMP by reference, as long as a <br />complete SWMP can be reproduced and submined to the requesting agency within the time frame specified in <br />the request. Those portions of the referenced documems must be included in the submittal. The SWMP must <br />also be readily available to an on-sire inspector. <br />C. Comprehensive Facility Inspections <br />For active mining operations, the penninee shall make a thorough inspection of their stormwater management <br />system, at least twice per year (in the spring and fall), as detailed in Part I.D.S of the permit. These inspections <br />must be documented and summarized in the Annual Report (see Part /.E.I of the permit). <br />For inactive mining operations, a thorough inspection of the stonnwater management system is required at least <br />once per year. Where annual inspections of inactive mines are impracticable, an inspection and certification of <br />compliance are required once every three years by a Registered Professional Engineer, as detailed in Part I.D.S of <br />the permit. These inspections must be documented and summarized in the Compliance Report (see Pan I.E.1 of the <br />permit). <br />For remediation projects, the penninee shall make a thorough inspection of their stonnwater management system ar <br />least once per year (during the field season). Where annual inspections of inactive mines are impracticable, an <br />inspection and certification of compliance are required once every two years. These inspections must be documented <br />and surnrnarized in the Annual Report (see Part I.E.1 of the permit). <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.