My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48182
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48182
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:24:05 PM
Creation date
11/23/2007 4:09:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981057
IBM Index Class Name
General Documents
Doc Date
3/24/2005
Doc Name
Citizen Complaint-Additional
From
Marty Gould
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />ANDERSON CONSULTING ENCIINEERS, INC. <br />Civil Water Resources Environmental <br />March 25, 2005 <br />Mr.~homas A. Schreiner._~ <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br /> <br />RECEIVE® <br />~ MAR 2 92005 <br />Division of Minerals and Geology <br />Re: Durham Pit Flood Control Mitigation Plan -Completion Deadline <br />[ACE Project No. COVC03-Ol] <br />Dear Tom: _ _ _ _ <br />On behalf of the Varra Companies, Inc., Anderson Consulting Engineers, Inc. (ACE) is pleased to <br />report that the long-term Flood Control Mitigation Plan for the Durham Pit is on schedule for <br />completion by March 31, 2005. As you are aware this long-term Flood Control Measure was <br />required as part ofthe Division ofMinerals and Geology (DMG) October 27, 2004 Findings ofFact, <br />Conclusions of Law and Order for the Varra Companies, Inc. Mining Permit Amendment. The <br />Findings of Fact stated that the long-term plan would be submitted to the DMG in the form of a <br />Technical Revision by March 30, 2005. Additionally, the Findings of Fact indicated that the long- <br />term plan would be submitted to the applicable local, state and federal flood control agencies by <br />March 31, 2005. As a matter of efficiency, I am requesting that we be allowed to officially deliver <br />the design package (plans and specifications) and Conditional Letter ofMap Revision report to DMG <br />and Weld County during our scheduled meeting at Weld County on April 1, 2005. As you are aware <br />meeting dates earlier in the week were not conducive to Kim Ogle's (Weld County Planning <br />Department) schedule. <br />If you have any questions or comments concerning this request, please do not hesitate to call me at <br />(970)226-0120. <br />Sincerely, <br />ANDERSON C SULTING ENGINEERS, INC. <br />Chris J. Pauley, P.E., C.F.M. <br />Project Manager <br />CJP/vla <br />Cc: Chris Varra, Varra Companies, lnc., w/ attachments <br />"t:\OPr N\Covc03-01\Letters~COVC03-01 'ISchreiner FC\1N Dclicery Lll-I'INAI_doc <br />3nN200~ <br />772 Whalers Way, Suite 200 • Fort Collins, CO. 80525 <br />Phone: (970) 226-0120 • Fax: (970) 226-0121 • www.acewater.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.