My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48164
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48164
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:24:03 PM
Creation date
11/23/2007 4:08:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
General Documents
Doc Date
1/6/1984
Doc Name
ENGINEERING & ENVIRONMENTAL STUDIES TO PERMIT NORTH DELTA DUMP AS A SANITARY LANDFILL
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />6.0 RECLAMATION PLAN <br />r <br /> The following sections provide information and specifications for the <br /> reclamation of the site as landfilling is completed. However, the envi ron- <br /> mental conditions including climate, exposure, and soi ls at the site are very <br /> harsh and will make successful reclamation difficult to achieve. For this <br /> <br /> reason, we have recommended the application of a mini mum of 2.6 feet of top- <br /> cover over the landfill rather than the CDH required minimum of 2 feet, In <br /> addition, more extensive reclamation measures have been recormmended for the <br /> north and south slopes of the landfill as these areas are considered crit ical <br /> areas in terms of exposure and erosion. <br /> <br />. 6.1 SURFACE DRAINAGE <br />After landfilling and reclamation are complete, a permanent drainage <br />ditch should be constructed above the slope situated along the southern bound- <br />ary of the landfill. This ditch will reduce the amount of water flowing over <br />the slope, thus reducing the potential for erosion. A shallow retention pond <br />with approximately 60,000 square feet of surface area and 2 feet of depth <br />should be constructed on the eastern terrace to receive the outflow from the <br />drainage ditch. The retention pond has been designed with sufficient capacity <br />to allow water to evaporate between precipitation events. However, water <br />contained in the pond can be used to irrigate the slope along the southern <br />boundary of the landfill after completion of reclamation operations. Plate 3 <br />shows the locations of the permanent drainage ditch and retention pond. ATso <br />shown is a drainage cross section for the ditch. Appendix D contains dis- <br />charge, storage capacity, and channel design calculations. <br />-36- <br />
The URL can be used to link to this page
Your browser does not support the video tag.