My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48034
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:23:45 PM
Creation date
11/23/2007 4:02:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
General Documents
Doc Date
9/27/1984
Doc Name
MAINTENANCE AND UPGRADE OF CYCC WATER SYSTEM PN 79-197
From
COLO YAMPA COAL
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • iii iiiiiiiiniuiii <br />999 <br />Getty <br />Colorado Yampa Coal I 29588 Routt County Road #27, Oak Creek. CO 80467 • Telepho~~3 /?9~38Q0 <br />n <br />S<F > > <br />~~lNpp /FN " ~ i,S,°« <br />September 24, 1984 Co%Dep~~f~'a~~~~Bo~fVIS/~f! <br />yes <br />Ms. Sandra Emrich <br />Colorado Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Re: Maintenance and Upgrade of CYCC <br />Water System; Permit 79-197 <br />Dear Ms. Emrich: <br />In recent months the Colorado Yampa Coal Company (CYCC) has been in <br />the process of maintaining and upgrading its current water system. In <br />the Fall of 1983, CYCC drilled a new well at Tipple 4k2, down to the Trout <br />Creek aquifer to supplement its water supply, The new tipple well has <br />never produced water in sufficient quantities to meet our current needs. <br />CYCC is planning to drill a well to the west of Pond D to make up for the <br />deficiencies of the tipple well and install another storage tank adjacent <br />to the tank located north of the main office. All precautions will be <br />taken to insure the protection of environmental resources during the <br />upgrading and maintenance of the CYCC water system. <br />Sincerely, <br />David McMindes <br />Environmental Coordinator <br />DM/kk <br />cc: G. Consalus <br />F. Milliken <br />E. Fidler <br />R. LiConti <br />K. Watson <br />J. Saunders <br />L. Damrau <br />L. Snowden <br />B. Williams <br />
The URL can be used to link to this page
Your browser does not support the video tag.