My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48025
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:23:43 PM
Creation date
11/23/2007 4:01:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
4/9/1997
Doc Name
MINING PERMIT ā(Dated 4/4/97 to 4/4/02)ā
Permit Index Doc Type
PERMIT LEGAL DOCUMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pF'CO~ <br />u~ iiii~iiiiiiii r~i <br />4~ <br />°' g COLORADO DIVISION OF MINERALS AND GEOLOGY <br />~ā¢,~" 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />MINING PERMIT -COAL <br /> <br />APR 0 91997 <br />Perini[ Date: April 04, 1997 Permit No. C-96-0$~visien RI Mine~nā u ,.,,,,,,,, ,; <br />Permit Expiration Date: April 04, 2002 <br />THIS PERMIT is issued by the Division of Minerals and Geology, Depaztmen[ of Natural Resources, <br />State of Colorado. <br />RECITALS <br />I. Bowie Resources Limited ("operator") desires to conduct a mining operation known as the <br />Bowie No. 2 Mine for [he purpose of extracting coal. <br />II. On April 04, 1997, the Division of Minerals and Geology ("the Division") approved the <br />operator's application for this permit, fixed the amount of bond and directed that this permit <br />be issued upon the filing with the Division of bond in the amount so fixed in form and <br />substance approved by the Division, and such bond has been so furnished. <br />III. On February 24, 1997 the Division made the following findings: <br />(a) The permit application is accurate and contains all information required under C.R.S., <br />34-33-101 et seq. and regulations promulgated thereunder and that all the requirements <br />of Article 33 of Title 34, C.R.S. ("such article") for the issue of a permit have been <br />complied with; <br />(b) The applicant has demonstrated that reclamation as required by such article can be <br />accomplished under the reclamation plan contained in the permit application; <br />(c) The assessment of the probable cumulative impact of al] anticipated mining in the azea <br />on the hydrologic balance specified in Section 34-33-110(2)(1) has been made by the <br />Division and the proposed operation thereof has been designed to prevent material <br />damage to the hydrologic balance outside the permit azea; <br />
The URL can be used to link to this page
Your browser does not support the video tag.