Bulkhead Design for AMD page 24 October 27-29, 1998
<br />REFERENCES
<br />Abel, J.F., Jr., 1993a, Bulkhead design for the Sunnyside Mine:
<br />consulting report to Sunnyside Gold Corp., 54 p
<br />Abel, J.F., Jr., 1993b, Bulkhead design philosophy: consulting
<br />report to Intermountain Mine Services, Inc., 12 p
<br />Abel, J.F., Jr., 1997, Bulkhead design for the Ransom Tunnel:
<br />consulting report to Sunnyside Gold Corp., 3 p
<br />American Concrete Institute, 1977, Recommended practice for
<br />evaluation of strength test results of concrete (ACI 219-77):
<br />23 p
<br />American Concrete Institute, 1983, Recommended practice for
<br />evaluation of strength test results of concrete (ACI
<br />214-77)(Reapproved 1983): 23 p
<br />American Concrete Institute, 1989, Building code requirements for
<br />structural plain concrete (ACI 318.1-89) and commentary - ACI
<br />318.1R-89: 14 p
<br />American Concrete Institute, 1993, Guide for selecting proportions
<br />for high-strength concrete with Portland cement and fly ash
<br />(ACI 211.4R-93): 13 p
<br />American Concrete Institute, 1995, Building code requirements for
<br />structural concrete (ACI 318-95) and commentary - ACI 318R-95:
<br />369 p
<br />American Institute of Steel Construction, 1989, Manual of steel
<br />construction, allowable stress design: 9th ed, AZSC, Inc.,
<br />1121 p
<br />J.D. Bredehoeft, R.G. Wolff, W.S. Keys & E. Shuter, 1976, Hydraulic
<br />fracturing to determine the regional in situ stress field,
<br />Piceance Basin: Colorado: GSA Bulletin, v 87, p 250-258.
<br />Brown, A., Consultants, Inc., 1992 a, Preliminary design of plug for
<br />the Reynolds Adit, Summitville Mine, Colorado: Report
<br />1288B/920825, Aug 19, 33 p
<br />Brown, A., Consultants, Inc., 1°.92b, Adit plugging case histories:
<br />Report 1268B/,921105, Nov 5, 17 p
<br />Brown, A., Consultants, Inc., 1992c, Model evaluation of the
<br />effectiveness of plugging the Reynolds Adit: Report
<br />1288B/920813/R1, Nov 19, 26 p
<br />- 24 -
<br />
|