My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47840
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:23:13 PM
Creation date
11/23/2007 3:49:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980003
IBM Index Class Name
General Documents
Doc Date
1/13/1988
Doc Name
HG MINE PN C-80-003
From
HG COAL CO
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H - G COAL COMPANY <br />MINE OPERATIONS <br />P. O. Box 711 <br />HAYDEN, COLORADO 81839 <br />(393) z7B-311e <br />III IIIIIIIIIIIIIIII <br />999 <br />BUBINE56 OFFICE <br />5731 STATE HIOMWAY 13 <br />MEEKER, COLORADO 81941 <br />;303) exu4sl <br />January 11, 1987 <br />Ms. Sandy Brown <br />Colorado Mined Land Reclamation Division <br />423 Centennial Bldg. <br />1313 Sherman Street <br />Denver, CO 80203-2273 <br />RE: N-6 MINE, PERMIT fiC-80-003 <br />Dear Sandy: <br />This letter will serve as <br />conversation of January 8, 1988. <br /> <br />JAN 13 1988 <br />MINED LAND <br />RECLAMATION OIU;~laN <br />a follow-up to our telephone <br />As I discussed with you, we are concerned with two issues. The <br />first issue is to request further clarification of the Inspection Report <br />summarizing the inspection of the H-G mine on October 14-16, 1987. In <br />particular we would like further clarification of the results of the <br />topsoil survey. As we discussed, we feel that since the Division could <br />only drill to a depth of 24 inches, the statement that "the average depth <br />was 21.75 inches" would be based on a biased sampling technique. We <br />believe the Division's depth sampling results are not entirely <br />representative of the topsoil depths at the mine. <br />The second issue involves a commitment by the Division based on <br />this and past field surveys that the replaced topsoil depth meets the <br />requirements of the reclamation plan. This commitment would be in the <br />context of the necessary partial bond release requirements. Although we do <br />not request any specific topsoil related reduction in the bond at this <br />time, a determination by the Division that replaced topsoil depths are <br />adequate will hasten the release of the mine operator's obligations in this <br />issue. <br />
The URL can be used to link to this page
Your browser does not support the video tag.