My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47767
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47767
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:23:06 PM
Creation date
11/23/2007 3:45:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
General Documents
Doc Date
5/18/1999
Doc Name
DOCUMENTED QUOTE GRASSY GAP COAL MINE MAINTENANCE PROJECT PKA-9-1070
From
DMG
To
INTERESTED CONTRACTORS
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19.3 EXECUTION <br />Operators <br />The equipment shall be furnished complete with competent operating personnel. Operators shall <br />be qualified to perform all work under this specification in a skillful and professional manner. The <br />OWNER may, in writing, require the CONTRACTOR to remove from the work any employee the <br />OWNER deems incompetent or careless. The OWNER will be the sole judge of the acceptability <br />of any employee. <br />Supervision <br />The CONTRACTOR shall be responsible for the supervision of all mechanical operations of the <br />equipment including proper maintenance. <br />Equipment maintenance, fueling and repairs shall be done sot that spilling of lubricants and fuel <br />is minimized. <br />Performance of Work <br />Supplemental work shall be performed after the general construction work in that particular area <br />and shall consist of general earthmoving or other finishing work as may be directed by the <br />PROJECT MANAGER. <br />All operations under this section will be under the direct supervision of the PROJECT MANAGER <br />and work under this section shall be performed only as ordered and directed by the PROJECT <br />MANAGER. The PROJECT MANAGER will designate the work to be performed and the order <br />in which it is to be done, and WILL inspect all work. The PROJECT MANAGER will maintain <br />documentation of the work. <br />Equipment Rental Documentation <br />At the close of each day's operations during which equipment rental work has been conducted <br />under this specification, the PROJECT MANAGER shall prepare a form entitled "Equipment <br />Rental Record" listing the date, times and total hours (computed to the nearest one-half hour), <br />each piece of equipment was operated in accordance with this specification. The PROJECT <br />MANAGER will obtain the signature of the CONTRACTOR on the form. <br />"Operation" means that time spent in performing work as well as time necessary for moving <br />equipment around the work site when directed by the PROJECT MANAGER. However, <br />"operation" does not include that time spent in transporting the equipment to the initial work site, <br />removing the equipment when atl work had been completed, transporting the equipment away <br />from and returning it to the work site in the event of a temporary or seasonal suspension•of <br />operation, maintenance of the equipment, any time during which the equipment is "bogged down" <br />or otherwise not working, nor for any periods when operations are suspended by the PRINCIPLE <br />REPRESENTATIVE. <br />Colorado Division of Minerals 8 Geology GENERAL BID SPECIFICATIONS <br />1996 Page 78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.