Doc Date
5/18/1999
Doc Name
DOCUMENTED QUOTE GRASSY GAP COAL MINE MAINTENANCE PROJECT PKA-9-1070
From
DMG
To
INTERESTED CONTRACTORS
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- mixed on-site, equipment and mixing procedures shall conform to ACI 301, Chapter 7. If <br />'ready mix' is used, it shall be mixed and transported in accordance with ASTM C 94. <br />Concrete shall be thoroughly compacted by means of a suitable mechanical vibrator. <br />- Upon completion of concrete curing, the dirt excavated from the embankment shall be <br />replaced on top of the new concrete. The material shall be replaced in such a manner so that <br />the slope of the embankment is returned to its original condition, and so that the top of the <br />CMP riser is six inches (6") above the elevation of the embankment slopes. The fill shall be <br />mechanically compacted during placement. <br />- A hinged steel grate shall be placed over the top of the CMP riser. The grate shall be <br />constructed using 1-1/4" structural rebar welded on eight-inch (8") centers in both directions. <br />Two (2} extra heavy-duty hinges, having non-removable pins shall be welded to the CMP riser <br />and to the steel grate cover on the uphill side of the riser. A hasp, constructed of 3/8" steel, <br />and having a circular hole of Y:" diameter, shall be welded to the CMP riser and the steel grate <br />on the down hill side of the riser. <br />Measurement and Payment <br />There will be no measurement for payment. Payment for this task will be reflected in a lump sum <br />bid under Item 3 on the Bid Schedule. This lump sum bid will cover all costs for cutting of the CMP <br />riser, offsite disposal of the excess CMP material, excavation of the embankment, form <br />construction, purchase and installation of the bentonite, purchase and installation of the concrete, <br />backfilling and compaction over the concrete, construction and installation of the hinged steel <br />grate. Payment shall be as this task is completed and approved by the PROJECT MANAGER. <br />Such payment shall be considered full compensation for all labor, materials, equipment and all <br />other items necessary and incidental to the completion of Task 3, Sediment Pond Dewatering <br />Device Repair. <br />Task 4 Sealing Sediment Pond <br />In order to minimize the infiltration of water from the sediment pond, bentonite will be placed within <br />the pond. Bentonite shall be placed on the base of the pond and up the side slopes to the <br />elevation of the lowest inlet of the CMP riser. <br />CONTRACTOR shall ensure that the pond is free of water prior to initiating this Task. Upon <br />completion of dewatering, if necessary, CONTRACTOR shall stake the elevation of the side slopes <br />of the pond at the elevation of the lower most inlet to the CMP riser. In order to ensure that the <br />proper elevation is established, the use of a tripod mounted surveyors level is required. <br />The surface area of the pond to be affected by this Task shall be scarified to a depth of four inches <br />(4") through the use of a disc harrow. Two inches (2") of dry bentonite shall be placed on the '. <br />prepared work area after the discing is completed. This material will be worked into the base and <br />side slopes of the pond by discing the affected area until the bentonite is well incorporated into the <br />scarified surface. <br />Measurement and Payment <br />There will be no measurement for payment. Payment for this task will be reflected in a lump sum <br />bid under Item 4 on the Bid Schedule. This lump sum bid will cover all costs for identifying the <br />area to be affected by this Task, preparation of the area, and purchase and installation of the <br />bentonite materials. Payment shall be as this task is completed and approved by the PROJECT <br />MANAGER. Such payment shall be considered full compensation for all labor, materials, <br />
The URL can be used to link to this page
Your browser does not support the video tag.