Laserfiche WebLink
,; . <br />REPRESENTATIVE BOTTOM ASH BAMPLE SHALL HE COLLECTED FROM THE <br />BOILERB AT THE GOLDEN POWER PLANT. LABORATORY ANALYSIS WILL <br />CONSIST OF SATURATION EXTRACTS AND E.P. TOXICITY TEST FOR EACH <br />SAMPLE. ADDITIONAL FLY ASH AND BOTTOM ASH SAMPLES WILL BE <br />COLLECTED AND ANALYZED, IF AT ANY TIME, A SOURCE OF COAL IS <br />CHANGED. RESULTB OF SATURATION EXTRACTS AND TOXICITY TESTS WILL HE <br />SIIBMITTED TO THE DIVISION WITHIN 15 DAYS OF ANALYSIS. <br />Stipulation No. 25 <br />AN ANNUAL EVALUATION OF ASH DISPOSAL INCLUDING, BUT NOT LIMITED TO, <br />SOIIRCE OF ASH, ASH QUALITY, TOTAL AMOIINT OF ASH DISPOSED OF, <br />AVERAGE DEPTH OF ASH AND AERIAL EXTENT OF DISPOSAL AREAS, <br />TRANSPORTATION AND DISPOSAL TECHNIQIIES, AFTER QUALITY MONITORING <br />DATA, AND FUTIIRE ASH DISPOSAL SHOULD BE INCLUDED IN THE ANNUAL <br />HYDROLOGY AND RECLAMATION REPORT. MONTHLY REPORTS CONSISTING OF <br />SOURCE OF ASH, MATERIAL QUANTITIES DISPOSED OF, DEPTH OF ASH AND <br />AERIAL E%TENT, RATER QUALITY MONITORING DATA, AND DISPOSAL PROBLEMS <br />(IF ANY) BHOULD HE MADE AVAILABLE AT THE MINE OFFICE. <br />Stipulation No. 26 <br />PRIOR TO RESUMPTION OF COAL EXTRACTION OR ASBOCZATED SURFACE <br />DIBTIIRBANCE AT THE REENESHURG MINE, THE PERMITTEE WILL OBTAIN <br />APPROVAL OF A REVISION WHICH WILL PROVIDE AN UPDATED MINING AND <br />RECLAMATION SCHEDIILE AND WHICH WILL DEMONSTRATE SIIFFICIENCY OF THE <br />RECLAMATION BOND FOR THE PROJECTED WORST CASE DISTURBANCE DURING <br />THE PERMIT TERM. <br />IV. Bonding <br />The Division currently holds the bond amount of $4,402,022.00 for <br />the Keenesburg Mine site. This amount was calculated for the <br />worst-case scenario during the actual mining of coal in A and B <br />Pits. Since circumstances at the mine have since changed, this <br />bond amount may be subject to change. Should Coors wish to be <br />considered for a bond reduction, an in-depth bond estimate needs to <br />be submitted to the Division for review. The site is adequately <br />bonded at this time. <br />Conclusion <br />This concludes the Division's Mid-term adequacy review. Deadline <br />for Mid-term resolution is May 3, 1994. Request for responses and <br />supporting documentations and revisions need to be made to the <br />Division no later than March 21, 1994 in order to complete the <br />review and meet the Mid-term date. <br />Thanking you in advance for your immediate attention to these <br />matters. <br />ses/keenmtr <br />