Laserfiche WebLink
Powerlines, Power Poles and Guy Wires <br />The portions of the electrical power distribution system for the <br />Sunlight mine which are to be removed by the CONTRACTOR are shown <br />on drawing sheets 1 and 2 of 9. Each drawing specifies which pole <br />and wire segments are to be removed, and which segments are to <br />remain in place. Removal of power and/or light poles shall include <br />the above grade portion of the wood pole or pole pairs, all <br />crossbars, braces, hardware, fixtures, other electrical components, <br />transformers, guy wires, and any other wires, cables ,conduit, or <br />other materials affixed to the pole. Removal of the powerline <br />wires or cable shall include all wires or cable supported on, <br />affixed to, or otherwise connected to or associated with the <br />powerline segment specified for removal on the above-referenced <br />exhibits. Poles which can be accessed with appropriate equipment <br />can be pulled out intact if desired, otherwise the pole(s) shall be <br />removed by cutting at a maximum height of 4" above the existing <br />ground surface. All poles and wires located in undisturbed areas, <br />disturbed areas where shrub vegetation has became well established, <br />or areas here any earthwork is necessary in order to provide mobile <br />equipment access shall be removed without the use of any equipment <br />which will disturb the existing land surface or cause damage to <br />existing shrub vegetation. Non-salvaged items covered under this <br />specification shall be disposed of either by back stowing within the <br />inclined mine entry at a minimum distance of 50 ft. from the <br />surface, or by hauling to an approved landfill operation. <br />4.3 Measurement and Payment <br />No measurement for payment shall be made for structural and electrical <br />utilities demolition and removal. Payment shall be for the lump sum bid <br />price established on the Bid Schedule for each bid item listed. The <br />price bid shall include all of the CONTRACTOR'S cost of whatever nature <br />to provide complete structural demolition and removal in accordance with <br />the plans and specifications, including demolition or dismantlement, <br />complete removal from the project site if salvaged, and on-site <br />underground disposal or hauling to and dumping in an approved landfill <br />site. <br />/ern <br />4843E <br />-11- <br />