Laserfiche WebLink
4.0 STRUCTURAL AND ELECTRICAL UTILITIES DEMOLITION AND REMOVAL <br />4.1 Description <br />This specification covers all work required to demolish, raze, or <br />otherwise dismantle and dispose of all structures, facilities, and <br />electrical utilities listed under 4.2 .B below. Structures and facilities <br />are shown on drawing sheets 1 through 6 of 9; electrical utilities are <br />shown on drawing sheets 1 and 2 of 9. <br />4.2 Execution <br />A. Salvage <br />The CONTRACTOR is allowed salvage rights to all mining related <br />structures, facilities, mining equipment, parts, supplies and materials <br />remaining within the Sunlight mine working area limits at the time of the <br />on site pre-bid meeting. Salvage rights are also allowed for all mine <br />electrical power and lighting system poles, wires, fixtures, and any <br />other electrical equipment which is not the property of the Holy Cross <br />Electric Association and which is specified for removal on attached <br />drawing sheets 1 and 2 of 9. Any salvageable items desired to be taken <br />from structures that are not specified for demolition shall be removed <br />from the structure(s) only in accordance with the following conditions: <br />Items shall be removed in such a manner that does not reduce the <br />existing structural integrity or stability of the structure; <br />2. Any structures that are partially dismantled or otherwise altered <br />in order to remove salvageable items must either be reconstructed <br />to their previous configuration and level of structural stability <br />or completely demolished down to surface grade and removed/disposed <br />of in accordance with the requirements of Section 4.2 .B .1 below. <br />The dollar amount bid by the CONTRACTOR for demolition and removal of <br />each item listed on the Bid Sdiedule shall consist of the total cost of <br />demolition, removal and/or disposal less anticipated salvage value, if <br />any. <br />Demolition and Removal <br />The CONTRACTOR shall demolish or dismantle, remove from the mine site if <br />salvaged, or dispose of on site or at an approved landfill operation. <br />All of the following structures, utilities and materials in accordance <br />with the specifications set forth in items 1 through 6 below. In no case <br />shall any materials be left on the surface of our outside the working <br />area limits, unless authorized by the PROJECT MANAGER. <br />-g- <br />