Laserfiche WebLink
<br />The Corley Company <br />Phons 832-8050 P.O Boa 1821 <br />COLORADO BPRINGS COLORADO 80801 <br />Nov. 18, 1994 <br />Mr. Jim McArdle <br />Division of Minerals 5 Geology <br />1313 Sherman St. <br />Denver CO 80203 <br />Dear Mr. McArdle: <br /> <br />RECEIVED <br />NOV 21 19~+ <br />D'aisioD or rnmerars & Geology <br />The Corley Company would like to make the following formal complaints <br />concerning the GEC East Pit work. <br />1. The westerly slope of Chen's Hill and the northerly slope of the hill <br />between the East and West Pits are steeper than 3:1 H:V. <br />2. There is almost no topsoil on the westerly slope of Chen's Hill. <br />3. The drainage ditch along the road at the toe of Chen's Hill has not <br />functioned adequately. This ditch has become completely filled with silt <br />near the entrance gate with most of the water and sediment entering Energy <br />Fuel's sediment pond. The silt deposition is sufficient to cover the first <br />strand of barbed wire on the fence on the west side of the road. <br />4. The silt deposition on the road will probably close the road during next <br />year's rains. <br />5. The road has nearly been washed out near the East Pit because of <br />inadequate provision for water to cross the road. <br />6. The entrance gate was damaged by the construction machinery, and we have <br />asked the contractor to replace the gate. <br />7. The entrance gate post was removed by the contractor. He did net replace <br />the post correctly, requiring that the post support be bent to connect to the <br />post. The post needs to removed again and reset with the correct <br />positioning. <br />8. The contractor's dozer was parked for an extended time outside the gate. <br />The dozer has leaked a considerable amount of oil that should be removed. <br />9. Most of the concrete structures have not functioned. !+-+st were not <br />installed correctly. <br />Sincerely, <br />W <br />W.D. Corley, <br />President <br />