Laserfiche WebLink
<br /> <br />COLORADO YINED LAND <br />FIELD DIRECTIVE RECLAwAnottDtvtsloN <br />1313 Sherman SL, RM 215 <br />Demw, W 80203-2273 <br />(303) 8663567 <br />Prgea t~an,e ~ . ~j ~ Psi °ao~ G - ry = .9~ <br />cantrac~or name L~~/>'A() ^ ' ~ Niq-S~ yC eie r <br />Contrac0or address PO • <br /> Req! <br />PmJecl Manager ~~ Fleld D4eetlve i ~~ <br />Use this form to authorae work changes due to changed conditions within the scope of the Purchase Order Contrail. Feld <br />electives resulting in increased Contrail price or Completion time must be approved by a formal Change Order within 14 days. <br />e following changes are authorized at the direilan of the PROJECT MANAGER: <br />ITEM No. DESCRIPTION OF CHANGES $ IncreaselDecrease <br />i Fu% C~~~rl~rFic~-,-,o-/ ~rt% ~~wr~~FO G~,ti~~~,~-~ <br /> <br /> .SlFi3 <br />lc% <br />~ <br />jn~r~~9'~ <br />-~~~ ~~ <br />fT <br />V <br />~ar ~ <br />~ ~~ T~fT <br /> ~ <br />/ <br />/ <br />~ <br />` <br />'_ <br />~ <br />n <br />V/r~~ I~ U/-J/'1 I~~'v~ /TS J~F7~"-JN l/Y /lfY <br /> rOL~-Dwiv(~ ~l~G~/~ . <br /> <br /> /~ <br /> <br /> <br /> ~ -i <br />Net change in Contrail price <br />~ Net change in Contract time <br />~ <br />$ Days <br />This document shall become an amendment to the Contract. All Contract provisions shall apply. <br />Approved by: ~_, <br />~_` /~ ~`~~ <br />M Date: <br />'~ ~'~`~ <br />~ <br />,Project <br />anager J <br />Accepted by: Date: <br /> <br />Contractor / <br />~ `' <br />Orgional- rgect er Cc y nuactor <br />