Laserfiche WebLink
• s • <br /> t Coal Reclamation Project <br />GEC/Ea February 15, 1994 <br /> RN-MINES-322 <br /> REVISED BID SCHEDULE <br /> Unit <br />I em Description Qty Unit Price Amount <br />1 Mobilization and demobilization 1 Job N/A $54.000.00 <br />2 Chen's Hill Reduction 1 Job N/A $100,729.00 <br />3 Chen's Hill Dreinage Control <br /> a) With riprap 100 Ln Ft $1~ $1.000.00 <br /> b) Without riprap 1300 I,n Ft $4.25 $5.525.00 <br />4 Chen's Hill Topsoil Replacement 1 Job N/A $10.000.00 <br />5 West Slope Reduction 1 lob N/A $2 3. 69.00 <br /> Dt?r .t?rt?n <br />7 West Slope Topsoil Replacement 1 Job N/A $4.033.00 <br />8 North End Bacld'ill and Grading 1 Job N/A $20.348.00 <br />9 North End Topsoil Replacement 1 Job N/A $6.453.00 <br />10 East Pit Backfdl from West to East 1 Job N/A $50.000.00 <br />11 East Pit Slope Reduction from East to West 1 Job N/A $5(1,0~.~~0 <br />12 East Pit Channel Reconstnrction <br /> a) With erosion mat 100 Ln Ft $15_00 $1 5.. D(1.4Q <br /> b) With erosion mat & riprep 250 Ln Ft $20_00 $~,DD0.04 <br /> c) Without erosion mat 2200 Ln Ft $0.30 $660.00 <br /> d) Drop Structures 15 Each $1600.00 $24 000.00 <br />13 East Pit Topsoil Replacement 1 Job N/A $5.000.00 <br />14 Revegetation <br /> a) Fertilizer 75 Acres $43_00 $3.225.00 <br /> b) Seeding 75 Acres $5_00 $375.00 <br /> c) Mulching and crimping 10 Acres $200.00 $2 000.00 <br />15 CAT D-8L Bulldozer, with operator, <br /> or Equivalent. Offering 335 FHP 16 Hours $90.00 $1 440.00 <br />16 CAT 621 E Sctaper, with operator, 16 Hours $162.22 $2 595.52 <br /> or equivalent. Offering 450 FHP <br />GRAND TOTAL <br />mve e:\wp31\projecb\OP.Cbid~h.lab <br />$3so.zsz.sz <br />Page 1 of 1 Page <br />