My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47526
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47526
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:22:40 PM
Creation date
11/23/2007 3:35:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
11/30/1994
Doc Name
MEMO GEC EAST PIT CLAIM C-81-037 RN-MINES-EWW
From
DMG
To
SANDRA BROWN
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~~ P ~~i&s <br />Item # Il Amount - SSS00.00 <br /> <br />CWL quarried arul stockpiled a large quantity of nprop to be used in the East Pit Channel <br />Reconstntction (Bid schedule item #12D, drop structures, task I2). Some of this is still <br />stockpiled on site. Altogether, 9 structures were deleted of IS to be completed according to the <br />contract Claim Item #S a6ave addresses 3 of the 9 deletions Tlds claim is for the work to <br />quarry nprop for deleted xnrk (6 or more stnuctures), alor~ with compensation for the extra <br />rtp-ap CWL placed in the 6 structures built and the naulown area at the far north erui of the <br />channel <br />John Nelson asked CWG to use the extra rtprap in the structures CWL had built and place some <br />at'the North end of this dunutel where the cluatrtel ran out of the project area He indicated <br />at the time he would pay for this work At other times he balked when asked for compensation <br />CWG placed some of this ex7m rock in the structure built Also some was placed at the Nonh <br />end of the charuiel where it runs out of the project. <br />Please see the estimated quantities clause of the General Conditions. CWL demands to be paid <br />for the portion of the deleted work that CWL did prior to it being deleted also for the extra <br />work that John Nelson requested <br />Response: The PROJECT MANAGER never agreed to pay for the CONTRACTOR for <br />the rock which is not present on site. The rock was a by-product of reducing the East Pit <br />Highwall, and was not "quarried". <br />The PROJECT MANAGER never ageed to pay for extra rock placed in drop structures <br />or in the north end dam in the erosioif /ally. The CONTRACTOR had excess oversize rock <br />and the CONTRACTOR voluntarily placed some of the excess riprap in the drop structures. <br />John Nelson suggested putting some of it at the north end dam in an erosion gully. This <br />was done simply as a way to dispose of it, instead of having waste rock piles left on the <br />project site. The CONTRACTOR did not indicate that this would be a cost item and <br />therefore, no field order or purchase order was completed authorizing the work. The <br />CONTRACTOR was well aware of We need to obtain written authorization prior to <br />commencing extra work. <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.