Laserfiche WebLink
r <br /> <br />the area was reinspected and found to be partially completed such that the narrow portion of the <br />ditch was supplemented by the road sloping outwazd from the pad. As soon as concrete for the <br />bollazds protecting the leak collection pipes cures, the road grading will be completed. <br />We have also confirmed that the section of the diversion ditch that appeazs from visual <br />observations to flow uphill has been properly survey and resurveyed and is confirmed to have <br />an appropriate gradient. <br />The attached memorandum from Bateman confirms this information. <br />I believe this answers the questions that azose during your December I5, 1994 inspection. <br />S nc ely, <br />vv <br />Joh E. Harda ay <br />M ager Environmental Affairs <br />Attachments (2): a/s <br />FILE: CC&VSTIP.003 <br />