Laserfiche WebLink
O <br /> Table No. i <br /> Lafarge West Inc. <br /> Loveland Pit <br /> Wafer Balance & Lease Wafer Required from the City of Loveland for Replacements ti <br /> ,;Q 5 <br /> PIMP f <br /> NbR <br /> l <br /> January F Fri <br /> "e111ualy0.09 0.13 <br /> --6-22 0.20 0.00 0.1 <br /> March <br /> 0.00 0.2 <br /> April 0.35 0.30- 0.01 0.3 <br /> May 0.50 0441 0.01 0.4 <br /> June 0.63 0.53 0.01 <br /> 0,5 <br /> July 0.68 0459 0.01 0.6 <br /> August .0.60 0.57 0.01 0.6 <br /> September 0.36 �04 2 0,01 0.4 <br /> October 0.28 0.33 0.01 0,3 <br /> November 0.15 -- 0.23 0.00 0.2 <br /> December 0.06 0.15 0.00 0.2 <br /> 7:0��4.0 Total <br /> 4.1 <br /> (A)Total mining depletions at Loveland Pit <br /> (B) Lagged Mining Depletions from Stream Depletion Model Run <br /> (C)Transit Losses from Loveland WWTP to Loveland Pit Pit, 2.0% <br /> (D) Lease water required from City of Loveland (8)+(C) <br />