My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47452
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47452
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:22:34 PM
Creation date
11/23/2007 3:29:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
General Documents
Doc Date
10/9/1985
Doc Name
MINING PERMIT COAL (Dated 10/9/85 to 10/9/88)
Permit Index Doc Type
PERMIT LEGAL DOCUMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br />Continuance of Rider to Mining Permit <br />Stipulation No. 7 <br />PRIOR TO CONSTRUCTION OF THE ACCESS ROAD, THE APPLICANT MUST SUBMIT <br />SITE SPECIFIC DESIGN STANDARDS FOR EMBANKMENT STABILITY, FOR DIVISION <br />APPROVAL. THE ANALYSIS SHALL BE CONDUCTED IN CONFORMANCE WITH RULE <br />4.03.1(3)(d)(vii). THE DESIGN STANDARDS SHALL BE SUBMITTED AS A <br />REVISION TO THE PERMIT APPLICATION. <br />Stipulation No. 8 <br />THE DIVISION REQUIRES THE PERMITTEE IN THE EVENT THAT SINKHOLE <br />SUBSIDENCE COLLAPSE WERE DETERMINED, BY THE DIVISION, TO CONSTITUTE A <br />POTENTIAL HAZARD TO THE PUBLIC HEALTH AND SAFETY, TO IMPLEMENT <br />APPROPRIATE SEALING AND BACKFILLING OF SINKHOLE COLLAPSE FEATURES. <br />Stipulation No. 9 <br />THE DIVISION REQUIRES THE PERMITTEE IN THE EVENT THAT ANY SLOPE <br />INSTABILITY IS DETERMINED BY THE DIVISION TO HAVE DEVELOPED WITHIN THE <br />AFFECTED AREA, TO SUBMIT TO THE DIVISION FOR REVIEW AN ANALYSIS OF THE <br />CAUSES AND RESULTANT HAZARDS OF ANY SUCH UNSTABLE SLOPE AREA. USING <br />THIS ANALYSIS, THE DIVISION SHALL DECIDE WHETHER A HAZARD IS <br />REPRESENTED BY ANY SPECIFIC SLOPE MOVEMENT EVENT AND WHETHER A SLOPE <br />STABILIZATION PROGRAM SHOULD BE DEVELOPED AND IMPLEMENTED. <br />Stipulation No. 10 <br />IF THE U.S. BUREAU OF MINES AND THE PERMITTEE HAVE NOT AGREED TO A <br />SUBSIDENCE MONITORING PROGRAM ACCEPTABLE TO THE DIVISION PRIOR TO <br />COMPLETION OF THE ROCK TUNNEL, THE DIVISION WILL REQUIRE THE PERMITTEE <br />TO AMEND ITS CURRENT SUBSIDENCE MONITORING PROGRAM. FURTHER, NO MINING <br />SHALL OCCUR WITHIN THE COAL SEAM UNTIL THE PERMITTEE HAS OBTAINED <br />APPROVAL FROM THE DIVISION FOR THE AMENDED SUBSIDENCE MONITORING <br />PROGRAM. <br />Stipulation No. 11 <br />THE DIVISION DIRECTS THE PERMITTEE TO PREPARE AND SUBMIT A FORMAT FOR <br />THE REQUIRED SEMI-ANNUAL SUBSIDENCE MONITORING REPORTS. THIS PROPOSED <br />REPORT FORMAT SHALL BE SUBMITTED FOR DIVISION REVIEW WITHIN SIX MONTHS <br />FOLLOWING ISSUANCE OF THE PERMIT. FURTHER, THE PERMITTEE SHALL HAVE <br />OBTAINED APPROVAL OF THE SUBSIDENCE REPORT FORMAT PRIOR TO ANY MINING <br />WITHIN THE COAL SEAM. <br />
The URL can be used to link to this page
Your browser does not support the video tag.