Laserfiche WebLink
<br />RIDER TO MINING PERMIT <br />Permit Date September 12 1985 Permit No. C-065-84 <br />The following additional stipulations and conditions form an integral part of <br />the foregoing permit: <br />Stipulation No. 1 <br />THE RECLAMATION STANDARD FOR NEWLY DISTURBED AREAS WILL APPLY TO THOSE <br />AREAS OF OLD MINING DISTURBANCE WHICH ARE TO BE REDISTURBED AND <br />RECLAIMED, UNLESS THE PERMITTEE SUBMITS TO THE DIVISION AN APPROVABLE <br />POST-MINING LAND USE FOR THESE AREAS. <br />Stipulation No. 2 <br />WITHIN THREE MONTHS OF PERMIT ISSUANCE, THE PERMITTEE MUST SUBMIT TO <br />THE DIVISION NEW DESIGNS ALLOWING FOR A GREATER SLOPE ON CHANNEL A TO <br />INSURE FLOW THROUGH THE CHANNEL LENGTH. THE PERMITTEE MUST COMMIT TO <br />INSPECTION OF THE DITCH AFTER RUNOFF EVENTS TO LOCATE AREAS OF <br />EXCESSIVE EROSION. THE PERMITTEE MUST ALSO COMMIT TO APPROPRIATE <br />EROSION PREVENTION IF NEEDED. THESE DESIGNS MUST BE SUBMITTED FOR <br />DIVISION APPROVAL BEFORE DISTURBING ANY AREA AT THE PROPOSED SURFACE <br />FACILITIES SITE. <br />Stipulation No. 3 <br />THE DIVISION REQUIRES THAT THE PERMITTEE SUBMIT AN ANNUAL HYDROLOGIC <br />REPORT BY JANUARY 15 OF EACH YEAR INCORPORATING THE FOLLOWING: <br />A. BEDROCK WELLS AND ALLUVIAL/COLLUVIAL WELLS <br />SK-3.75 <br />SK-3H (ZONES 1, 2, AND 3) <br />OW-4L <br />OW-8 <br />OW-7 <br />OW-3L <br />BEFORE AND AFTER ROCK TUNNEL DEVELOPMENT THESE WELLS ARE TO BE SAMPLED <br />QUARTERLY FOR THE A) FIELD PARAMETERS LISTED BELOW AND B) ANALYZED <br />ONCE YEARLY FOR THE CHEMICAL PARAMETERS LISTED BELOW. THE SAMPLING <br />PERIOD FOR ALL WELLS SHOULD BE WITHIN AS SHORT A TIME PERIOD AS <br />POSSIBLE. <br /> <br />OCT~ 1 1 1985 <br />RECL MIATION D VISION <br />