Laserfiche WebLink
ENVIRONMENTS INC. PAGE 3 <br />DECEMBER 23, 2004 <br />Attached you will find a revised page 38 removing BLM and <br />showing CDOW and McIntyre/Sheridan as adjoining owners. Also <br />attached is a revised Page 44 listing McIntyre/Sheridan as owners <br />of 1 - 3 strand wire fence along. the south line of the permit <br />area and an irrigation headgate. Note that the headgate is <br />marked as not being within 200 feet of the, mined area. We have <br />left .the Vail Ditch on the list as a precaution. We also point. <br />out that the assessment on page 43 regarding the Vail Ditch apply <br />to the headgate especially since no mining will take place within <br />390 feet of the headgate. I have also attached a copy of the <br />small scale version of the revised Pre-Mining Map - Map Exhibit C <br />prepared by G&H Engineering in July 2004. This small scale map <br />will be replaced with a full scale map after the holiday season. <br />We will look forward to meeting with you at the mine on <br />December 29, 2004 at 9:00 am to review the site. If you have any <br />further questions please call me. <br />Sincerely, <br />Environment, Inc <br />Stevan L. O'Brian <br />President ~ " <br />cc Willits Construction CO. <br />G&H Engineering <br />file <br />enclosure <br />