My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-07-16_GENERAL DOCUMENTS - C1980007
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2001-07-16_GENERAL DOCUMENTS - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2021 3:16:23 PM
Creation date
11/23/2007 3:29:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
7/16/2001
Doc Name
Proposed Decision & Findings of Compliance for RN4
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Road Name Road Location <br /> Silo Haul/Access Road Between silos and MB-2R <br /> Stacktubes Haul/Access Road Between upper and lower stacktube pads <br /> Middle Mine Haul/Access Road Between breaker building and Main haul/access <br /> road <br /> Road Name Road Location <br /> Upper Haul/Access Road Between the intersection of the Middle Mine <br /> haul/access road and the Main haul/access road <br /> and the Portal access road <br /> Main Haul/Access Road Between Highway 133 and the intersection of <br /> the Middle Mine haul/access road and the Main <br /> haul/access road <br /> Sylvester Gulch Haul/Access Road Between Main haul/access road and the <br /> Sylvester Gulch Ventilation Facilities <br /> As coal or coal mine waste may be hauled on the above roads, all of the <br /> roads have been designed, constructed and certified as haul roads. As-built <br /> certifications are provided in Exhibit 8A of the permit document. A <br /> discussion of the haul/access roads is found in Section 2.05.3 in Volume 1 <br /> of the permit document. The designs are in compliance with Rules 2.05.3 <br /> and 4.03.1. Haul/access roads are shown on Map 53 and 53B. <br /> 2. With the exception of a portion of the Sylvester Gulch Haul/Access Road. <br /> these haul/access roads will be reclaimed upon closure of the mine when the <br /> roads are no longer necessary. A portion of the Sylvester Gulch <br /> Haul/Access Road (from the Main haul/access road to the Sylvester Gulch <br /> fan) will be reduced to a light use road and will provide access to the fan site <br /> and areas to the south. <br /> B. Access Roads <br /> 1. The West Elk Mine has three access roads which are considered access <br /> roads only. These include the Sylvester Gulch Substation Access Road the <br /> Portal access road, and the Materials Storage Bench access road, which are <br /> shown on Map 53 and 53B. Access roads are properly certified. These <br /> certifications are provided in Exhibit 8A of the permit document. A <br /> discussion of the access roads can be found in Section 2.05.3 in Volume 1 of <br /> the permit document. The designs are in compliance with Rules 2.05.3 and <br /> 4.03.2. <br /> 2. All of the these roads will be reclaimed upon closure of the mine when the <br /> roads are no longer necessary. <br /> 3. The proposed upper waste pile includes an access road to be used to <br /> transport waste to the site. The road is planned to be 2,500 feet long, a full <br /> cut-section, gravel surfaced road with grades up to 10 percent. Because of <br /> 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.