My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47431
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:22:30 PM
Creation date
11/23/2007 3:28:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984062
IBM Index Class Name
General Documents
Doc Date
8/2/1984
Doc Name
PROPOSED DECISION AND FINDINGS OF COMPLIANCE
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br />Stipulation No. 4 <br />INSTANTANEOUS STREAMFLOW MEASUREMENTS SHALL BE OBTAINED AND RECORDED BY <br />THE PERMITTEE AT THE SAME TIME THAT WATER QUALITY SAMPLES ARE COLLECTED AT <br />SITE 29 ON MIDDLE CREEK AT A MINIMUM DURING THE MONTHS FROM JUNE THROUGH <br />OCTOBER. THESE FLOW MEASUREMENTS SHALL BE INCLUDED IN THE PERMITTEE'S <br />ANNUAL HYDROLOGIC MONITORING REPORT. <br />Stipulation No. 5 <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST AMEND THE <br />RECLAMATION TIMETABLE UNDER RULE 2.05.4 OF THE PERMIT APPLICATION TO <br />INCLUDE RECLAMATION AND RESTORATION OF THE DISTURBED AREA ASSOCIATED 41ITH <br />THE MIDDLE CREEK MINE OFFICE COMPLEX. <br />Stipulation No. 6 <br />THE PERMITTEE SHALL SUBMIT THE DESIGN FOR THE HAUL ROAD DRAINAGE DITCHES <br />AS A TECHNICAL REVISION TO THE DIVISION FOR APPROVAL PRIOR TO CONSTRUCTION. <br />Stipulation No. 7 <br />WITHIN 30 DAYS OF PERMIT ISSUANCE THE PERMITTEE MUST SUBMIT DESIGNS FOR <br />THE MIDDLE CREEK DETENTION BASIN ADEQUATE TO CONTAIN THE FLOWS FROM THE 10 <br />YEAR - 24 HOUR STORM AND IN CONFORMANCE WITH RULE 4.05.6. APPROVAL OF THE <br />DESIGN MUST BE OBTAINED PRIOR TO CONSTRUCTION. <br />Stipulation No. 8 <br />WITHIN 30 DAYS OF PERMIT ISSUANCE COLORADO YAMPA COAL COMPANY MUST SUBMIT <br />TO THE DIVISION, TO BE INCORPORATED INTO THE PERMIT APPLICATION, A PLAN <br />FOR DEWATERING THE DETENTION BASINS TO THE ELEVATION NECESSARY TO CONTAIN <br />THE 10 YEAR - 24 HOUR STORM. THIS PLAN SHOULD INCLUDE THE RUNOFF <br />CALCULATIONS FOR THE STORM AND THE POND ELEVATION NECESSARY TO CONTAIN <br />THIS RUNOFF WITHOUT DISCHARGING THROUGH THE EMERGENCY SPILLWAY. SEDIMENT <br />INFLOW NEEDS TO BE CONSIDERED IN THIS CALCULATION. <br />Stipulation No. 9 <br />THE PERMITTEE MUST SUBMIT TO THE DIVISION, TO BE INCORPORATED INTO THE <br />PERMIT APPLICATION, A PLAN FOR POND MAINTENANCE AND CLEAN OUT SO THAT THE <br />POND WILL HAVE ADEQUATE VOLUME FOR STORAGE OF THE 10 YEAR - 24 HOUR <br />STORM. THIS INFORMATION MUST BE SUBMITTED 30 DAYS OF PERMIT ISSUANCE. <br />Stipulation No. 10 <br />BECAUSE THE RETENTION OF WATER IN THE DETENTION BASINS WILL EXCEED 2 <br />AC-F T, THE PERMITTEE MUST CONTACT THE STATE WATER COURT TO FILE AN <br />AUGMENTATION PLAN SHOULD THIS WATER BE NEEDED. THE PERMITTEE SHALL <br />PROVIDE THE DIVISION WITH A COPY OF THE SUBMITTED AUGMENTATION PLAN WITHIN <br />60 DAYS OF PERMIT ISSUANCE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.