Laserfiche WebLink
I. TOPSOIL <br />A. REMOVAL <br />Maximum tons removed per day x,000 during construction only. <br />Tons removed per year N/A <br />Proposed controls for topsoil removal: (rheck appropriate hoses) <br />® Moist Material <br />® Water spray <br />^ Other (specify) <br />^ No Control <br />H. TOPSOIL STOCKPILE <br />Maximum stored at one time 6,000 tons. <br />Maximum stored per year 6,000 tons. <br />Length of time pile remains undisturbed 20 years <br />Proposed controls for topsoil stockpile: (check appropriate boa) <br />^ watering times/day, or continuous sprinkler (t~~ <br />maintain moist surface). <br />^ Chemical stabilizer (Type: ). <br />^ Compacting of piles, method <br />^ Enclosures: complete, or partial (check one) <br />© Revegetation, (Length of time till revegetationfirst veer ). <br />^ Other (specify) <br />^ No control <br />II. OVERBIIRDEN <br />A. REMOVAL- During Construciton only <br />Maximum tons removed per day 2,On0 site preparation <br />Tons removed per year sn~nnn <br />Equipment used for removal <br />Proposed controls for overburden removal: check appropriate hoses) <br />© Moist Material <br />® Water Spray <br />^ Other (apecilp) <br />^ No Control <br />2 <br />