My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47354
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47354
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:22:22 PM
Creation date
11/23/2007 3:23:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
General Documents
Doc Date
7/24/1987
Doc Name
SUSPENSION OF OPERATIONS & PRODUCTION US COAL LEASE D-056298
From
CYPRUS EMPIRE CORP
To
BLM
Permit Index Doc Type
Other Permits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
li <br />a. Specific Terms and Other Requirements Affected. <br />Terms and Conditions Suspended. The following lease terms are suspended for <br />non-FCLAA coal and solid mineral leases during the effective period of an <br />approved suspension of operations: <br />° Beneficial use of the lease; <br />° Hiaimum production requirement; and <br />° Minimum royalty payment. <br />Terms and Conditions Not Suspended. The following lease terms and other <br />requirements are not suspended during the effective period of a suspension of <br />operations: <br />° Deferred bonus payments; <br />° Rental; <br />° Payment of royalty for: 1) non-FCLAA coal or solid minerals that <br />were mined prior to the effective date of the suspension of <br />operations but disposed of by sale or otherwise during the <br />suspension period; or 2) non-FCLAA coal or solid minerals that were <br />mined for safety reasons during the auepension period; <br />° Reclamation requirements; <br />° t41ne-maintenance requirements; <br />- Casual use; end <br />° Public and mine personnel health and safety requirements. <br />Terms and Conditions Eztended. There are no non-FCLAA coal or solid mineral <br />lease terms or other requirements that are eztended by a suspension of <br />operations. <br />Terms and Conditions Not Eztended. Due to the importance of these terms, it <br />is re-emphasized that a auepension of operations specifically dcea not eztend <br />the following Ieaae terms: <br />° Lease term (i.e., the lease ezpiration date); and <br />° Lease read~uatment or renewal due date. <br />b. Effective Date and Duration of Suspension Period. <br />Effective Date. In accordance with the regulations for solid mineral lessen <br />codified at 43 CFR 3503.3-2, the authorized officer specifies the effective <br />date of a suspension of operations. <br />For non-PCLAA coal and solid minerals, the auepension of minimum royalty <br />payments begins either with the first day of the lease month during which the <br />auepension of operations becomes effective or, if the effective date of the <br />• auepension and the first day of the lease month do not coincide, with the <br />first day of the lease month following the effective suspension date. <br />{ <br />Attachment 1-15 <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.