Laserfiche WebLink
6 <br />° Continued operation production requirement. <br />° Payment of advance royalty in lieu of continued operation. <br />° MIA Section 2(a)(2)(A) commercial quantities production. <br />° MLA Section 2(d) LO-year mine-out requirement. <br />Terms and Conditions Not Suspended. The following lease terms and other <br />requirements are not suspended during the period that a suspension of <br />operations and production is in effect: <br />° Deferred bonus payment. <br />° Payment of royalty for: <br />1) Coal or solid minerals that were mined prior to the effective <br />date of the suspension, but were disposed of by sale or <br />otherwise during the suspension period; or <br />2) Coal or solid minerals that ace mined for safety reasons <br />during the suspension period. <br />° Reclamation requirements. <br />° Casual use. <br />° Mine-maintenance requirements. <br />° Public and mine personnel health and safety requirements. <br />° Diligent development commercial quantities requirement (FCLAA Coal <br />leases only). <br />Terms and Conditions Eztended. The following lease terms and conditions <br />are eztended by an amount of time equal to the duration of the suepensioa of <br />operations and production for all coal or solid mineral leases. The e:tenaion <br />ie added to the original time-frame-related lease terms and conditions upon <br />the effective date of the termination or ezpiration of the suepensioa of <br />operatioae and production: <br />° Lease term for leases with a determinate term (see below). <br />° MIA Section 2(a)(2)(A) 10-year holding period for coal leases only. <br />° The lease readjustment daces for lessee with determinate terms. <br />° Solid mineral lease renewal due date. <br />° Continued operation year, for FCLAA coal lessee or LMU's that have <br />achieved diligent development. <br />3-year resource recovery and protection plan due date (see 43 CFR <br />3482.1(b) or 3487.1(e)(1), as appropriate) for FCLM coal leases or <br />LlfU' e. <br />° LMU 40-year mine-out period (see 43 CF8 3487.1(e)(6)). <br />Terms and Conditions Not Eztended. <br />° The first coal lease readjustment anniversary date after FCLAA. (A <br />son-FCLAA lease was originally issued for an indeterminate term and <br />moat be made subject to a determinate term before 1t can be <br />eztended.) <br />° The 10-year diligent development period for FCLAA coal leases or <br />LMU's (see 43 CFR 3483.3(b)(2)). <br />° The readjustment date for phosphate and potassium leases (these are <br />l indeterminate term leases). <br />Attachment 1-9 <br />