reclaimed, and CRDA-I has been reclaimed with the exception of a segment oftemporary road up the <br />side of the pile that has been left open to allow for disposal of coaly material during the course of <br />reclamation operations. The slopes of the RSRDA have been fully reclaimed and revegetated. The <br />flat top of the pile was approved as an equipment storage area during operations, and has not been <br />revegetated. <br />Refuse disposal within the Roadside Refuse Disposal Area (RSRDA) was completed in the early <br />1980's, and the slopes of the pile were temporarily stabilized. The flat top of the RSRDA is a <br />permitted supply storage area. Final reclamation ofthe slopes ofthe RSRDA, including installation of <br />approved terrace drains, was completed in the fall of 2002. A stability analysis for the RSRDA is <br />provided in Appendix 13-4. Final grading is discussed in Tab 14. The reclamation plan for the top of <br />the RSRDA will be modified by approval of PR-3, as the flat top of the waste pile is included within <br />the designated alternative land use area (see Exhibits 6C and 6C-A). The top of the pile has been <br />gravel surfaced, and under the PR-3 "industrial or Commercial" land use reclamation plan, the area <br />will be left "as is" for use as a storage site for equipment and supplies associated with the commercial <br />fruit operation. The area will not be topsoiled or revegetated. The 1~` Quarter 2007 refuse pile <br />certification report documents that the required 18 inch minimum thickness of non-toxic cover <br />material was placed over the coal waste material on the flat top of the pile. A short segment of <br />existing Access Road 1 will be left in place for the postmining use. It will connect to the upper end of <br />proposed Access Road 1 A, to provide access to the storage area on top of the RSRDA. <br />The lower three benches of CRDA-1 and CRDA-2 were covered with the approved thickness of non- <br />toxic cover, seeded, and mulched in the late summer/fall of 1994. Final reclamation of the upper <br />benches was conducted in the spring of 2002. <br />Geotechnical analyses for CRDA-1, and CRDA-2, are provided in Appendices 13-4 and 13-5 of the <br />application. CRDA-1 has been constructed with three rock underdrains, and construction <br />specifications include 2:1 slopes with 10' wide benches on 30' vertical intervals. The benches aze <br />sloped to the inside and graded to drain to perimeter ditches along the sides of the pile. CRDA-2 <br />specifications are similar, with the exception that pile design does not incorporate underdrains, and <br />slope between benches is not to exceed 2.5:1. <br />Stability concerns associated with higher than anticipated water levels in Piezometer CRDA-O1 <br />resulted in suspension of waste disposal at the site in 1988, pending drainage modifications and <br />stability re-evaluation. Between 1988 and 1993, the lower three benches were regraded to provide for <br />better slope stability and drainage. Surface drainage was improved by the construction of diversion <br />ditches that allow surface runoff to exit around the pile instead of contacting the face. <br />A stability evaluation was performed in the spring of 1994 by Western Engineers, Inc. As a part ofthe <br />study, pump testing was conducted in existing piezometers and 30 additional piezometers were <br />installed to evaluate phreatic surfaces and pore pressures. The results of the study showed the pile to <br />be stable as designed. Critical water levels were defined for each of the 30 new piezometers. Based <br />on the study results, the operator was permitted to resume waste disposal at CRDA-I in 1994. The <br />operator has committed within the permit to monitor the 30 piezometers quarterly, and if water level in <br />any of the piezometers reaches critical target depth as listed on Table 18-4, stability ofthe pile will be <br />reevaluated and corrective action taken if necessary. <br />CRDA-l, and 2 will be monitored throughout construction. Monitoring will include: <br />Permit Revision No. 3 Permit No. C-1981-041 <br />July 30, 2007 Page 37 <br />